IGEM:IMPERIAL/2006/LabCalendar/2006-8-8: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
No edit summary |
|||
| Line 12: | Line 12: | ||
<font color="red"><b>To ensure we can re-maxiprep tomorrow we need to culture up more bacteria by the end of today.</b></font color="red"> | <font color="red"><b>To ensure we can re-maxiprep tomorrow we need to culture up more bacteria by the end of today.</b></font color="red"> | ||
Deepti and Johnny cultured up A with the last of the LB so it should be ready to maxiprep for tomorrow. The other ligations have a good chance of having been maxipreped successfuly so we can decide what to do tomorrow (LBs arriving tomorrow anyway). | |||
Revision as of 14:37, 8 August 2006
Electroporation of Ligations from yesterday
- Electroporated 12D->2H (3rd attempt...should be successful??? thrid time's a charm?) and 12D->2H B (the big part from the gel)
- Plates are in the incubator, needs to be minipreped tomorrow to check...and probably PCR to correlate.
Maxiprep of Ligations from yesterday
- Results of maxiprep of ligations A, M and Z may be dubious. Should repeat maxiprep for assurance.
- Maxiprep of ligations L, R and V should be fine.
To ensure we can re-maxiprep tomorrow we need to culture up more bacteria by the end of today.
Deepti and Johnny cultured up A with the last of the LB so it should be ready to maxiprep for tomorrow. The other ligations have a good chance of having been maxipreped successfuly so we can decide what to do tomorrow (LBs arriving tomorrow anyway).