20.385(S11): About the team mentoring: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
(New page: {{Template:20.20(S11)}} <div style="padding: 10px; width: 670px; border: 5px solid #CC9999;"> ===Team Progress and Mentoring Reports=== Each report should be a one to two page summary of y...) |
No edit summary |
||
Line 7: | Line 7: | ||
**Tech Spec progress report is due Wednesday April 6th | **Tech Spec progress report is due Wednesday April 6th | ||
**Final Briefing progress report is due Wednesday May 11th, <font color = red>including suggested grades </font color> for the contribution of each team member to the content of the final project. | **Final Briefing progress report is due Wednesday May 11th, <font color = red>including suggested grades </font color> for the contribution of each team member to the content of the final project. | ||
A sample progress report is offered [[Media:SampleProgressReport.pdf| here.]] This sample is a modified submission from JK in 20.902(S08).<br> | A sample progress report is offered [[Media:SampleProgressReport.pdf| here.]] This sample is a modified submission from JK in 20.902(S08). A sample progress report that is more focused on mentoring is offered [http://openwetware.org/images/9/95/SampleMentoringRecord.pdf here.] This sample is a modified submission from KB in 20.902(S08).<br> | ||
Each report is worth 10 points<br> | Each report is worth 10 points<br> | ||
Late reports will be penalized 0.5 points for each day late<br> | Late reports will be penalized 0.5 points for each day late<br> |
Latest revision as of 05:13, 30 January 2011
Team Progress and Mentoring Reports
Each report should be a one to two page summary of your freshman team's work and a summary of your contributions to accomplishing the project. The report should also include a summary of your freshman team's dynamics and a summary of your contributions to the workings of the team.
Each report is due on the day of your team's presentation.
- 3 ideas progress report is due Wednesday March 9th
- Tech Spec progress report is due Wednesday April 6th
- Final Briefing progress report is due Wednesday May 11th, including suggested grades for the contribution of each team member to the content of the final project.
A sample progress report is offered here. This sample is a modified submission from JK in 20.902(S08). A sample progress report that is more focused on mentoring is offered here. This sample is a modified submission from KB in 20.902(S08).
Each report is worth 10 points
Late reports will be penalized 0.5 points for each day late
Each report is worth 10% of your final grade (30% total)
Other contributions to your Team Mentoring Grade
- Team's project average
- Based on the grade for the 3 major assignments submitted by your freshman team
- Worth 15% of your final grade
- Instructor Leverage
- discretionary adjustment by NK
- Worth 5% of your final grade