31 January 2009: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
(New page: Date: 31 January 2009; Time: 1100; Agenda: Mid Log Phase Determination *Came back to obtain last 24 hr reading. This marks the end of the Mid Log Phase determination process. Results...) |
(No difference)
|
Revision as of 21:07, 31 January 2009
Date: 31 January 2009; Time: 1100; Agenda: Mid Log Phase Determination
- Came back to obtain last 24 hr reading. This marks the end of the Mid Log Phase determination process.
As can be seen from the results, mid-long phase for PA01 is about 6.5hrs as compared to Ecoli K12 of 5hrs.