AU Biomaterials Design Lab:Protocols/Fluorescence Peltier System: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
(New page: stuff)
 
No edit summary
 
Line 1: Line 1:
stuff
==Description==
 
 
==Protocol==
 
# Starting the Peltier controller
## Make sure that the ribbon cord connects the peltier controller and the cuvette holder
## Fill the chiller bucket with water
## Place the aquarium pump (with tubes attached to the Peltier heat exchanger) into the bucket and plug in the pump so that water flows
## Turn on the peltier controller (switch in the back of the instrument)
## Use the arrow buttons to set the temperature.
# Turning off the Peltier controller
## Turn the controller power off
## Unplug the aquarium pump
## Dump the water from the bucket into the sink
 
==Notes==
 
==References==
 
[[Category:Protocol]]
[[Category:AU-BDL]]

Latest revision as of 10:59, 26 August 2016

Description

Protocol

  1. Starting the Peltier controller
    1. Make sure that the ribbon cord connects the peltier controller and the cuvette holder
    2. Fill the chiller bucket with water
    3. Place the aquarium pump (with tubes attached to the Peltier heat exchanger) into the bucket and plug in the pump so that water flows
    4. Turn on the peltier controller (switch in the back of the instrument)
    5. Use the arrow buttons to set the temperature.
  2. Turning off the Peltier controller
    1. Turn the controller power off
    2. Unplug the aquarium pump
    3. Dump the water from the bucket into the sink

Notes

References