BE.109:DNA engineering/Lab report: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
m (BE.109: Schedule for your Mod1 Lab Report moved to BE.109:DNA engineering/Lab report schedule) |
No edit summary |
||
Line 1: | Line 1: | ||
{{Template:BE.109}} | |||
==Schedule for Module 1 laboratory reports== | |||
March 16/17 | ===March 16/17, 2006=== | ||
*First draft is due. | |||
===April 4/5, 2006=== | |||
*First draft is returned to students. | |||
Anything above a B can become an A+. | ===April 11/12, 2006=== | ||
*Final reports are due. | |||
B- can become A | *Your draft will be graded, and you will have the opportunity to improve your grade as follows: | ||
**Anything above a B can become an A+. | |||
C+ can become A- | **Anything above a B- can become an A | ||
**Anything above a C+ can become an A- | |||
C can become B+ | **Anything above a C can become a B+ | ||
**etc. | |||
etc. |
Revision as of 22:29, 8 February 2006
Schedule for Module 1 laboratory reports
March 16/17, 2006
- First draft is due.
April 4/5, 2006
- First draft is returned to students.
April 11/12, 2006
- Final reports are due.
- Your draft will be graded, and you will have the opportunity to improve your grade as follows:
- Anything above a B can become an A+.
- Anything above a B- can become an A
- Anything above a C+ can become an A-
- Anything above a C can become a B+
- etc.