BE.109:DNA engineering/Lab report: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
No edit summary |
|||
Line 18: | Line 18: | ||
**etc. | **etc. | ||
== | == Lab Report Guidelines for Module 1 == |
Revision as of 08:23, 9 February 2006
Schedule for Module 1 laboratory reports
March 16/17, 2006
- First draft is due.
April 4/5, 2006
- First draft is returned to students.
April 11/12, 2006
- Final reports are due.
- Your draft will be graded, and you will have the opportunity to improve your grade as follows:
- Anything above a B can become an A+.
- Anything above a B- can become an A
- Anything above a C+ can become an A-
- Anything above a C can become a B+
- etc.