IGEM:Harvard/2006/Cyanobacteria: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
No edit summary
Line 11: Line 11:
**'''Test the oscillator in E. coli'''
**'''Test the oscillator in E. coli'''
** Alternate phrasing, courtesy of Kit Parker - what is the "deliverable?" The thing you will point to and say "this is our project?"
** Alternate phrasing, courtesy of Kit Parker - what is the "deliverable?" The thing you will point to and say "this is our project?"
***'''Our deliverable is a (multiple?) BioBrick parts
***'''Our deliverable is a (multiple?) BioBrick part(s)
* What are two or three possible means of implementing the idea?
* What are two or three possible means of implementing the idea?
* Risk
* Risk

Revision as of 16:34, 17 June 2006

Organization Suggestions

Think about these questions when preparing your project proposals for the group meeting.

For each project idea:

  • What is the specific goal of the project?
    • Biobrick the oscillator
      • Biobrick kaiA, kaiBC.
      • need to find out how kaiA/BC are regulated to do so
    • Test the oscillator in E. coli
    • Alternate phrasing, courtesy of Kit Parker - what is the "deliverable?" The thing you will point to and say "this is our project?"
      • Our deliverable is a (multiple?) BioBrick part(s)
  • What are two or three possible means of implementing the idea?
  • Risk
    • How many untested things have to work for the project to succeed?
    • How will you test whether those things work or not?
    • How will you adjust your plan when one of these things fails to work?
    • How will you minimize the time/effort/resources lost to a failed design?
      • Can your time/effort/resources apply to more than one design simultaneously?
  • Reward
    • How cool, fun, exciting is the project for you?
    • What if any is the usefulness or societal benefit of the project?
    • What is going to impress the judges in November?
  • Timeline
    • What are the project milestones? (design, construction, testing)
    • What is the estimated time required for each? (always overestimate)
    • If you can't reach your ultimate goal by August, is there a satisfying intermediate goal?
    • What is the immediate next step in pursuing the project?
      • If DNA synthesis will be required, how soon will you have the sequence designed?

  • Nakajima et. al: in vitro, the proteins oscillate abeit not with as large of an amplitude