IGEM:Harvard/2006/Cyanobacteria: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
Line 9: | Line 9: | ||
* '''What is the specific goal of the project?''' | * '''What is the specific goal of the project?''' | ||
**Biobrick KaiABC oscillator | **Biobrick KaiABC oscillator | ||
*** | ***[http://www.kazusa.or.jp/cyano/WH8102/cgi-bin/orfinfo.cgi?title=Chr&name=SYNW0548&iden=1] Shows the location of kaiA,BC in WH8102 strain. 2.866kb for kaiABC + non-coding region. | ||
***''need to find out how kaiA/BC are regulated to do so'' | ***''need to find out how kaiA/BC are regulated to do so'' | ||
**'''Test the oscillator in E. coli''' | **'''Test the oscillator in E. coli''' |
Revision as of 16:57, 17 June 2006
Organization Suggestions
3000bp, 11cents/base. --> synthetic
Think about these questions when preparing your project proposals for the group meeting.
For each project idea:
- What is the specific goal of the project?
- Biobrick KaiABC oscillator
- [1] Shows the location of kaiA,BC in WH8102 strain. 2.866kb for kaiABC + non-coding region.
- need to find out how kaiA/BC are regulated to do so
- Test the oscillator in E. coli
- Alternate phrasing, courtesy of Kit Parker - what is the "deliverable?" The thing you will point to and say "this is our project?"
- Our deliverable is a (multiple?) BioBrick part(s)
- Biobrick KaiABC oscillator
- What are two or three possible means of implementing the idea?
- Risk
- How many untested things have to work for the project to succeed?
- How will you test whether those things work or not?
- How will you adjust your plan when one of these things fails to work?
- How will you minimize the time/effort/resources lost to a failed design?
- Can your time/effort/resources apply to more than one design simultaneously?
- Reward
- How cool, fun, exciting is the project for you?
- What if any is the usefulness or societal benefit of the project?
- What is going to impress the judges in November?
- Timeline
- What are the project milestones? (design, construction, testing)
- What is the estimated time required for each? (always overestimate)
- If you can't reach your ultimate goal by August, is there a satisfying intermediate goal?
- What is the immediate next step in pursuing the project?
- If DNA synthesis will be required, how soon will you have the sequence designed?
- Nakajima et. al: in vitro, the proteins oscillate abeit not with as large of an amplitude