IGEM:IMPERIAL/2006/ProjectCalendar/2006-9-4: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
{{IGEM:IMPERIAL/projectcalendar_tabs}} | {{IGEM:IMPERIAL/projectcalendar_tabs}} | ||
<!-- Note to editors: DO NOT REMOVE template call --> | <!-- Note to editors: DO NOT REMOVE template call --> | ||
=Progress Report= | |||
==Assemly== | |||
*Define the status of each test construct (under construction, sequenced, validated, faulty, ready for testing, tested, characterized) | |||
**Prey cell () | |||
**Prey cell with riboswitch () | |||
**Prey cell with Cre () | |||
**Predator sensing part () | |||
**aiiA test construct () | |||
**Full Predator construct () | |||
*others ??? | |||
*What is the current priority in terms of assembly process ? Why ? | |||
==Testing== | |||
*Define the status of each testing protocol (to be written, to be validated, validated, data collected, data analysed, faulty protocol) | |||
**Prey cell | |||
** | |||
==Modelling== | |||
==Doc & Presentation== |
Revision as of 03:21, 4 September 2006
Progress Report
Assemly
- Define the status of each test construct (under construction, sequenced, validated, faulty, ready for testing, tested, characterized)
- Prey cell ()
- Prey cell with riboswitch ()
- Prey cell with Cre ()
- Predator sensing part ()
- aiiA test construct ()
- Full Predator construct ()
- others ???
- What is the current priority in terms of assembly process ? Why ?
Testing
- Define the status of each testing protocol (to be written, to be validated, validated, data collected, data analysed, faulty protocol)
- Prey cell