IGEM:IMPERIAL/2006/ProjectCalendar/2006-9-4

From OpenWetWare
Revision as of 03:21, 4 September 2006 by Vincent Rouilly (talk | contribs)
Jump to navigationJump to search



Progress Report

Assemly

  • Define the status of each test construct (under construction, sequenced, validated, faulty, ready for testing, tested, characterized)
    • Prey cell ()
    • Prey cell with riboswitch ()
    • Prey cell with Cre ()
    • Predator sensing part ()
    • aiiA test construct ()
    • Full Predator construct ()
  • others ???
  • What is the current priority in terms of assembly process ? Why ?

Testing

  • Define the status of each testing protocol (to be written, to be validated, validated, data collected, data analysed, faulty protocol)
    • Prey cell


Modelling

Doc & Presentation