IGEM:IMPERIAL/2006/project/Oscillator/project browser/Full System/Implementation: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
Line 27: Line 27:


==Quality control==
==Quality control==
*define the quality control used at each step
__NOTOC__
*define possible enzymes to be used and their outcomes
{| border="1" cellpadding="0" width="100%"
*define design of primers to be used in sequencing
|-
!height="25pt" width="80pt"| Part !! Built !! Sequencing Results !! Primers Used for Sequencing
|-
|Put part logo and name here || has it been built? || sequencing analysis and link to sequence results || primers used
|-
|Put part logo and name here || has it been built? || sequencing analysis and link to sequence results || primers used
|-
|}


==WetLab work entries==
==WetLab work entries==

Revision as of 07:47, 28 October 2006

Super Parts Not applicable
Actual Part
Sub Parts Prey Construct Predator Construct


Ligation strategy

  • define the way you plan to build the part (a gantt chart could be good for the sake of clarity and planning)

Quality control

Part Built Sequencing Results Primers Used for Sequencing
Put part logo and name here has it been built? sequencing analysis and link to sequence results primers used
Put part logo and name here has it been built? sequencing analysis and link to sequence results primers used

WetLab work entries

  • The prey has been constructed and tested but is waiting parameter extraction.
  • The predator construct has not been ligated.