IGEM:IMPERIAL/2007/Dry Lab/Log: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
Line 41: Line 41:
===Tuesday 4th September===
===Tuesday 4th September===


*Spoke with testing team and have decided on a new staggering method to get overlap of data
*Spoke with testing team and have decided have come up with a template for importing data from notepad to excel


*Spoke with testing team and have decided to come up with a template for importing data from notepad to excel
*Spoke with testing team about wierd results and they are currently looking into it


**B will come up with this template
*Wiki design needs some work: needs to have a graphic language and make it more visual


*Having sorted out data using above template we need to do all of the tasks we set out yesterday
*Started Data Analysis today :
 
*Degradation: We have done some simple log based calculations do determine delta
*M to look at our pitch for modeling wiki today
**Deg 37
**Deg 20
**PTET 37
**PTET 20
**Plux 25


===Wednesday 5th September===
===Wednesday 5th September===
===Thursday 6th September===
===Thursday 6th September===
===Friday 7th September===
===Friday 7th September===

Revision as of 09:46, 4 September 2007

--Anthony Lazzaro 15:23, 3 September 2007 (EDT) Welcome to the Dry Lab Log ! Here you can see what work we've been doing in Modeling & Data Analysis in a Day to Day format.

Week 9

Monday 3rd September

We have recieved some data from the Testing team and need to do the following work on it for tomorrow

$$$$ Major Problems with Excel Sheets & staggering need to have a chat to lab team in morning not much work done tonight ! $$$$$

Data to be analysed:

1.Deg GFP @ 37 Degrees

  • need to normalise with respect to control
  • need to extract decay coeficient

2.Deg GFP @ 20

  • needs more data
  • need to nomalise
  • need to extract decay coeficient


3.Plux 25 Degrees

  • Normalise Data wrt control
  • Lag time
  • Rate of GFP synthesis
  • Steady State value given initial concentration

4.Ptet 20 degrees

  • Turning on of Promoter
  • Normalise wrt to control to get rid of increase in day 2


5.PTET @ 37 Degrees

  • Get Steady State Value / Maximum Value
  • Use Deg from 1. to determine K

6.Calibration cuve

  • Need more data not very useful at the moment

Tuesday 4th September

  • Spoke with testing team and have decided have come up with a template for importing data from notepad to excel
  • Spoke with testing team about wierd results and they are currently looking into it
  • Wiki design needs some work: needs to have a graphic language and make it more visual
  • Started Data Analysis today :
  • Degradation: We have done some simple log based calculations do determine delta
    • Deg 37
    • Deg 20
    • PTET 37
    • PTET 20
    • Plux 25

Wednesday 5th September

Thursday 6th September

Friday 7th September