====Proposed plan of action====
====Proposed plan of action====
#'''DsRed express''' - prioritise cloning and testing the constructs with DsRed Express
#'''DsRed express''' - prioritise cloning and testing the constructs with DsRed Express
#*Currently testing DsRed Express in-vitro (Calibration curve)
#'''GFP mut 3b''' - carry on looking for purified form so calibration and degradation curves can be derived
#'''GFP mut 3b''' - carry on looking for purified form so calibration and degradation curves can be derived
#*Do research to find degradation and calibration data in literature
#*Do research to find degradation and calibration data in literature
#DesRed 2 will be cloned just in case the other options don't work out
====Flurometer====
*Might get access to 24hr fluorometer - programmed data collection (biochem lab, level 6)
**Can carry out only the experiments at room temperature and degradation experiments

Revision as of 01:24, 7 September 2007



We have identified three phases of experiments for each of the project:

  • Phase 1 - Intial testing of the promoters and test constructs in vitro
  • Phase 2 - Testing/Validation of the test constructs
  • Phase 3 - Testing/Validation of final constructs

In addition any overlap between the experiments of the projects has been identified and considered when making the experimental design.


Time table

Testing of constructs and cell extracts

Week 8 Week 9 Week 10
Monday - Refine the wiki
Tuesday Prepare GFP solution-calibration
Construct Calibration Curve
Refine the wiki
Wednesday Test Home made cell extract
Test varying levels of cell extract
Thursday
Friday Prepare GFP solution-calibration
Construct Calibration Curve

CBD

Week 8 Week 9 Week 10
Monday - Exp with 15 and 25 °C
Tuesday Phase 1 - test pT7 Exp with 30 and 40 °C,
continue measuring 15 and 25 °C
Wednesday Exp with 10 and 45 °C,
continue measuring 30 and 40 °C
Thursday Test 20 and 37 °C,
Test GFP degradation at 20 and 37 °C
Test suitable step increases
Friday Second day testing 20 and 37 °C Test suitable gradient of temperature,
minimum working temp - maximum working temp

ID

Week 8 Week 9 Week 10
Monday -
Tuesday test pLux in-vitro - 1nM AHL Refine AHL concentrations range 25°C
Purify LuxR if plasmid arrives
Wednesday Choose a range of AHL concentrations range 37°C
Purify LuxR if plasmid arrives
Thursday Test purified LuxR
Friday Test construct with 5 AHL concentrations - 25 °C Test purified LuxR


Meeting to sort the GFP crisis!

Options

  1. GFP
    • AcGFP -
    • GFP mut3b - need to get the purified form
      • Ask around!
  2. RFP
    • DsRed - wild type
    • DsRed2 - can be visualied but has a long response time ~ 24hrs
    • DsRed express - can be visualised with UV, has response time of ~ 7-8hrs

Proposed plan of action

  1. DsRed express - prioritise cloning and testing the constructs with DsRed Express
    • Currently testing DsRed Express in-vitro (Calibration curve)
  2. GFP mut 3b - carry on looking for purified form so calibration and degradation curves can be derived
    • Do research to find degradation and calibration data in literature
  3. DesRed 2 will be cloned just in case the other options don't work out

Flurometer

  • Might get access to 24hr fluorometer - programmed data collection (biochem lab, level 6)
    • Can carry out only the experiments at room temperature and degradation experiments