We have identified three phases of experiments for each of the project:
- Phase 1 - Intial testing of the promoters and test constructs in vitro
- Phase 2 - Testing/Validation of the test constructs
- Phase 3 - Testing/Validation of final constructs
In addition any overlap between the experiments of the projects has been identified and considered when making the experimental design.
Time table
Testing of constructs and cell extracts
Week 8 | Week 9 | Week 10 | |
Monday | - | Refine the wiki | Planning the week DsRED arrives |
Tuesday | Prepare GFP solution-calibration Construct Calibration Curve Refine the wiki |
Prepare DsRED constructs (Ask Ben) | |
Wednesday | Test Home made cell extract Test varying levels of cell extract |
PROBLEM-Wrong GFP!!!! | Purify GFP Prepare DsRED constructs |
Thursday | Purify GFP Prepare DsRED constructs | ||
Friday | Prepare GFP solution-calibration Construct Calibration Curve |
Purify GFP + Test Concentration Prepare DsRED constructs |
CBD
Week 8 | Week 9 | Week 10 | |
Monday | - | ||
Tuesday | Phase 1 - test pT7 | 24 Hour Exp Room Temp | |
Wednesday | Define the thresholds of temperature | ||
Thursday | Test 20 and 37 °C, Test GFP degradation at 20 and 37 °C |
||
Friday | Second day testing 20 and 37 °C |
ID
Week 8 | Week 9 | Week 10 | |
Monday | - | Purified LuxR ready today | |
Tuesday | test pLux in-vitro - 1nM AHL | Refine AHL concentrations range 25°C Purify LuxR if plasmid arrives |
Test Purified LuxR with construct 2 |
Wednesday | Purify LuxR if plasmid arrives |
||
Thursday | Clone in plasmid | ||
Friday | Test construct with 5 AHL concentrations - 25 °C | Begin purification of LuxR |
Future Tests
(CE:Number of Cell extracts needed)
- Calibration curve GFP (CE:10)
- Calibration curve dsRED (CE:10)
- ID - Final Testing of AHL for dsRED (CE:20)
- CBD - Steep Gradient dsRED- ( Ask Alex about final app)
- Slow Gradient dsRED
- Final Test Temp range for DsREd(CE:20)
Total Cell Extracts Reactions Required For Project
- Week 10: 20
- Future testing: 60
- In Stock: 72 Reactions
Dependencies
- DsRed construct ( Tuesday)
- Maxi Preps:
- pLux Construct 2 - Wait for intial testing
- Negative Control - Constuct rbs:GFP:Terminator, No promotoer