IGEM:IMPERIAL/2007/Projects/Experimental Design: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
No edit summary
Line 2: Line 2:
<div class="tabs-blue">
<div class="tabs-blue">
<ul>
<ul>
<li id="current">[[IGEM:IMPERIAL/2007/Experimental Design|Introduction]]</li>
<li id="current">[[IGEM:IMPERIAL/2007/Projects/Experimental Design|Introduction]]</li>
<li>[[IGEM:IMPERIAL/2007/Experimental Design/Phase1|Phase 1]]</li>
<li>[[IGEM:IMPERIAL/2007/Experimental Design/Phase1|Phase 1]]</li>
<li>[[IGEM:IMPERIAL/2007/Experimental Design/Phase2|Phase 2]]</li>
<li>[[IGEM:IMPERIAL/2007/Experimental Design/Phase2|Phase 2]]</li>

Revision as of 08:28, 11 September 2007



We have identified three phases of experiments for each of the project:

  • Phase 1 - Intial testing of the promoters and test constructs in vitro
  • Phase 2 - Testing/Validation of the test constructs
  • Phase 3 - Testing/Validation of final constructs

In addition any overlap between the experiments of the projects has been identified and considered when making the experimental design.

Status

Time table

Testing of constructs and cell extracts

Week 8 Week 9 Week 10
Monday - Refine the wiki Planning the week
Tuesday Prepare GFP solution-calibration
Construct Calibration Curve
Refine the wiki
DsRED arrives
Wednesday Test Home made cell extract
Test varying levels of cell extract
PROBLEM-Wrong GFP!!!! Purify GFP
Prepare DsRED constructs
Thursday Purify GFP
Prepare DsRED constructs
Friday Prepare GFP solution-calibration
Construct Calibration Curve
Purify GFP + Test Concentration
Prepare DsRED constructs

CBD

Week 8 Week 9 Week 10
Monday -
Tuesday Phase 1 - test pT7 24 Hour Exp Room Temp
Investigate Evap Problem
Wednesday Define the thresholds of temperature
Thursday Test 20 and 37 °C,
Test GFP degradation at 20 and 37 °C
Friday Second day testing 20 and 37 °C

ID

Week 8 Week 9 Week 10
Monday - Purified LuxR ready today
Tuesday test pLux in-vitro - 1nM AHL Refine AHL concentrations range 25°C
Purify LuxR if plasmid arrives
Wednesday
Purify LuxR if plasmid arrives
Test Purified LuxR with construct 2
Thursday Clone in plasmid
Friday Test construct with 5 AHL concentrations - 25 °C Begin purification of LuxR


Future Tests

(CE:Number of Cell extracts needed)

  1. Calibration curve GFP (CE:10)
  2. Calibration curve dsRED (CE:10)
  3. ID - Final Testing of AHL for dsRED (CE:20)
  4. CBD - Steep Gradient dsRED- ( Ask Alex about final app)
    • Slow Gradient dsRED
    • Final Test Temp range for DsREd(CE:20)

Total Cell Extracts Reactions Required For Project

  • Week 10: 20
  • Future testing: 60
  • In Stock: 72 Reactions

Dependencies

  1. DsRed construct ( Tuesday)
  2. Maxi Preps:
    • pLux Construct 2 - Wait for intial testing
    • Negative Control - Constuct rbs:GFP:Terminator, No promotoer