We have identified three phases of experiments for each of the project:

  • Phase 1 - Intial testing of the promoters and test constructs in vitro
  • Phase 2 - Testing/Validation of the test constructs
  • Phase 3 - Testing/Validation of final constructs

In addition any overlap between the experiments of the projects has been identified and considered when making the experimental design.

Problems page

  • Contains a list of all the problems being faced by the team regarding the experiments being carried out

Time table

Testing of constructs and cell extracts

Week 8 Week 9 Week 10
Monday - Refine the wiki
Tuesday Prepare GFP solution-calibration
Construct Calibration Curve
Refine the wiki
Wednesday Test Home made cell extract
Test varying levels of cell extract
Thursday
Friday Prepare GFP solution-calibration
Construct Calibration Curve

CBD

Week 8 Week 9 Week 10
Monday - Exp with 15 and 25 °C
Tuesday Phase 1 - test pT7 Exp with 30 and 40 °C,
continue measuring 15 and 25 °C
Wednesday Exp with 10 and 45 °C,
continue measuring 30 and 40 °C
Thursday Test 20 and 37 °C,
Test GFP degradation at 20 and 37 °C
Test suitable step increases
Friday Second day testing 20 and 37 °C Test suitable gradient of temperature,
minimum working temp - maximum working temp

ID

Week 8 Week 9 Week 10
Monday -
Tuesday test pLux in-vitro - 1nM AHL Refine AHL concentrations range 25°C
Purify LuxR if plasmid arrives
Wednesday Choose a range of AHL concentrations range 37°C
Purify LuxR if plasmid arrives
Thursday Test purified LuxR
Friday Test construct with 5 AHL concentrations - 25 °C Test purified LuxR