IGEM:IMPERIAL/Methodology

From OpenWetWare
Revision as of 07:41, 1 October 2006 by Vincent Rouilly (talk | contribs)
Jump to navigationJump to search


Imperial College first steps in iGEM

  • This section intends to illustrate the framework used by the Imperial College iGEM Team in 2006. Over the summer 2006, for our first participation to iGEM, we wanted to explore how far we could push the traditional engineering approach in order to deal with a Synthetic Biology project.
  • Without constraining the students to a particular system, we wanted them to follow an engineering development cycle. As it is true for traditional engineering project management, it was thought to promote collaborative work, traceability and quality control throughout the all project.
  • The engineering development cycle was based on 5 steps : Specifications, Design, Modelling, Implementation and Testing/Validation