IGEM:Imperial/2010/Strategy: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 5: | Line 5: | ||
Three Lab-teams are currently working in parallel to assemble parts which will be needed for down-stream steps, as soon as the synthesized sequences arrive. | Three Lab-teams are currently working in parallel to assemble parts which will be needed for down-stream steps, as soon as the synthesized sequences arrive. | ||
*[[IGEM:Imperial/2010/XylE_team | XylE team (Maddie and Nicolas)]] | |||
*[[IGEM:Imperial/2010/Vectors_team | Vectors team (Kyasha and Kirill)]] | |||
*[[IGEM:Imperial/2010/Surface_Protein_team | Surface Protein team (Harriet and Florian)]] | |||
LINKS to shedule history (?) | LINKS to shedule history (?) |
Revision as of 08:29, 18 August 2010
Strategy
Please refer to the assembly strategy for details.
Three Lab-teams are currently working in parallel to assemble parts which will be needed for down-stream steps, as soon as the synthesized sequences arrive.
- XylE team (Maddie and Nicolas)
- Vectors team (Kyasha and Kirill)
- Surface Protein team (Harriet and Florian)
LINKS to shedule history (?)
Assembly strategy
Wolfs checklist
- Urgent primers have been ordered on Monday 16th.
- 14 other primers will be required. Design is in progress (pic of word table)!
- Experimental design for XylE e.coli testing!
- Functional testing strategies have been developed and have been indicated in the overall assembly strategy diagram. Need to be written up properly!
- XylE and TEV will not be tagged. In order to be able to analyse their activity, we will compare substrate-turnover rates.
- Strategies for testing of expression etc have to be developed and structured.
- List of parts for submission has to be assembled.
- Gant chart!
- How much synthetic AIP will be required to trigger our test system? (Modellers)
- ComE promoter system - recap on mode of function.