IGEM:Melbourne/2008/ProjectManagement

From OpenWetWare

< IGEM:Melbourne | 2008(Difference between revisions)
Jump to: navigation, search
Current revision (17:57, 25 March 2008) (view source)
(Wiki group)
 
Line 10: Line 10:
*Riboswitch:
*Riboswitch:
-
*Shiny
+
**Shiny
-
*Simon
+
**Simon
-
*Di
+
**Di
-
*Supervised by: Lloyd
+
**Supervised by: Lloyd
*Feedback Loops:
*Feedback Loops:
-
*Haozhen
+
**Haozhen
-
*Di
+
**Di
-
*Supervised by: Alisa
+
**Supervised by: Alisa
*Signal Input:
*Signal Input:
-
*Alex
+
**Alex
-
*Stephen
+
**Stephen
*Modelling:
*Modelling:
-
*Jason
+
**Jason
-
*Louis
+
**Louis
-
*David
+
**David
-
*Supervised by: Jan
+
**Supervised by: Jan
 +
 
 +
*Wiki organisation
 +
**Di
 +
**Stephen
 +
**Shiny
 +
**Supervised by: Jan
For those who weren't present at the meeting feel free to place yourselves somewhere else, these aren't set in stone.
For those who weren't present at the meeting feel free to place yourselves somewhere else, these aren't set in stone.

Current revision

Return to Melbourne Homepage

What we have so far
What we have so far


link to timetable spreadsheet

Division Of Labour

At the last meeting (9/2/08) We decided to split up our project assigning team membersto the groups as follows:

  • Riboswitch:
    • Shiny
    • Simon
    • Di
    • Supervised by: Lloyd
  • Feedback Loops:
    • Haozhen
    • Di
    • Supervised by: Alisa
  • Signal Input:
    • Alex
    • Stephen
  • Modelling:
    • Jason
    • Louis
    • David
    • Supervised by: Jan
  • Wiki organisation
    • Di
    • Stephen
    • Shiny
    • Supervised by: Jan

For those who weren't present at the meeting feel free to place yourselves somewhere else, these aren't set in stone.

Personal tools