ISISBio:Internal/To do: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
(new page)
 
No edit summary
Line 25: Line 25:


==For Cameron to do:==
==For Cameron to do:==
* Show Louise how to make a back page from this lab supplies one
* Follow up what is happening with the trough
* Follow up what is happening with the trough
** At the moment, not much.
* Ask Matt about organising test build of light scattering apparatus to go into Vesta
* Ask Matt about organising test build of light scattering apparatus to go into Vesta
** Luke is organising test build of light scattering apparatus

Revision as of 04:37, 28 April 2008

Home        Contact        Internal        Lab Members        Publications        Research        Talks       




Jobs Outstanding

Louise - to do list:

Fri 11th April 2008

  • get in an autoclave engineer - will do Mon a.m.
  • continue with Vicki's work - will do Mon a.m.
  • find out about centrifuges, rotors and protein concentrators
  • look into cover to prevent condensation dripping on AKTAs in cold room
  • move fermentor & control unit to Milton Park
  • Put a sign in cupboard to say NO LAB COATS ALLOWED IN HERE
  • Find out about booking system for Biolab
  • Make a back page here and put old arrived items list in it
  • Reply to last PC email and enquire about rest of order
  • Ask Matt about benching for BAM room and Biolab - done this - pending receipt of quotes & authorisation to place order
  • Sort out ELGA systems in Biolab - Matt will do next week
  • Work out costings for workers/users of Biolab
  • Prepare log sheets for Biolab equipment to be used for bookings
  • Do RAs and COSHH A in Biolab starting with updating Biolab general room RA, then autoclave RA.
  • Get in engineer for validations of autoclave and centrifuge commissioning - am chasing this on Mon
  • Chase Matt about ELGA engineer - chasing on Mon
  • Complete APR - start this next Friday
  • Chase up Matt for shaker incubator warranty/service info
  • do same for fermentor

For Cameron to do:

  • Follow up what is happening with the trough
    • At the moment, not much.
  • Ask Matt about organising test build of light scattering apparatus to go into Vesta
    • Luke is organising test build of light scattering apparatus