Klapperich Lab:Notebook/Lab Meeting Notes/2008/08/25: Difference between revisions
Cmklapperich (talk | contribs) No edit summary |
Cmklapperich (talk | contribs) No edit summary |
||
Line 74: | Line 74: | ||
* What are the specs on our pumps? <br> | * What are the specs on our pumps? <br> | ||
* Can KDS calibrate or fix it? <b> | * Can KDS calibrate or fix it? <b> | ||
* | * We need at least one more pump that does multiple channels. Mincheol will check the specs? <br> | ||
* '''What requirements does everyone have for their "IDEAL" pump.''' <br> | * '''What requirements does everyone have for their "IDEAL" pump.''' <br> | ||
Line 83: | Line 83: | ||
†Senior project <br> | †Senior project <br> | ||
* Megan still gone. <br> | |||
<br> | |||
†F31: Cochlea <br> | †F31: Cochlea <br> | ||
* Nathan in Orgeon <br> | |||
* | |||
<br> | |||
Revision as of 08:23, 25 August 2008
25 August 2008 Lab Meeting Agenda
- Announcements
† Discussion of Time for Fall Semester Group Meetings
Type when you are NOT available for group meetings HERE:
Cathie: MW afternoon, F all day
Sonali, Jaephil, MinCheol, open all week
Qingqing T/TH 10-12, 2-4pm, M 12-3, one lab still deciding
† Other Announcements
- Cathie Bring IBM laptop and drive from home
- No meeting 9/1.
- Register for CIMIT conference if you want. Irene can reimburse.
- Register for IMECE in Boston
- Register for MRS Boston if you want to.
†Flu R01
- Meeting set F afternoon (8/29)
- Planning plaque assay - protocol decided
†SEPSIS Project/Chip Bonding Issues
- Check if Anlee can do backscatter electrons on new SEM
- EF experiments results later today
- Chips did not bond - that were made last weekend.
- Controlled cooling with air plasma bond okay with Zeonor plaque.
- Topas COC resin may be better to try. Try and buy some. (this is what the plaques are made of) The COC might shrink less. (co-polymer).
- Jaephil will help Sonali get some new material for the sepsis chips.
- Wash is acetone then methanol sonication + DI water sonication. SEE UPDATED PROTOCOL!
†COBRA
- Jaephil and Mark making humidity and flowrate control box (temp too) for the concentration system.
- IEEE abstract submitted on 8/24.
- IBC for our lab STILL pending - Alexis will give us the requested revisions
- Cathie will submit this week (8/29)
- Tests on chips with covers underway
- Jane is investigating the multilayer design
† Valve Array
- Cathie contact Sumita Pennarthur at UCSB about her valves
- Waiting for fixture from Melissa
- Mark's Part is complete at this point
- Basic software in place
†Fraunhofer: LOAC
-
- Still troubleshooting
†Biointerfaces group
- Brett and Mincheol tried the SU8 process.
- Hussam made 6.5 microns SU8 - Using the Hard contact method
- Hussam made the PDMS part. Correct part, but overexposed. The thickness is too thin
- Mincheol will try the device as we have it
- Hussam will make 20 micron high with 1 micron space this week/or Brett
- SU8 thickness is important step in this process. So, ALIQUOT SU8 when it arrives.
- Solvent evaporation from the SU8 can be a real problem.
- Use the same spinner every time for this project.
- Wafer cleaning should be the same every time, too
- Hussam, Brett and MinCheol are going to make a protocol for this process
- AZP 4620 from Clariant. Hussam will try this photoresist (positive)
†CIMIT
- Meet with Sepsis Nurse Tuesday.
- QQ submitted abstract.
- Jane submited.
†PCR
- QQ Model has 30 cycles. MinCheol will try the model. Need to upgrade the Star-CD program. Dan Kamalic has to do this.
- Emailed Dan today.
- QQ passed qual!! yeah!!!
- Old heaters worked 20+ times, but then are not homogenous across chip.
- Waiting for new heaters to try again. Other brand was not good. Will use copper in the meantime for temp control.
- PUMP problem. Speed control at low flow rates is not stable.
- What are the specs on Wong's pump?
- What are the specs on our pumps?
- Can KDS calibrate or fix it?
- We need at least one more pump that does multiple channels. Mincheol will check the specs?
- What requirements does everyone have for their "IDEAL" pump.
†RCA
-
- Working on a test chip to examine mat'ls compatibility
†Senior project
- Megan still gone.
†F31: Cochlea
- Nathan in Orgeon
†Silica Optimization (Lambda):
-
|border="1" cellpadding="4" cellspacing="0" style="border:#c9c9c9 1px solid; margin: 1em 1em 1em 0; border-collapse: collapse;" width="800"
|-
|style="background-color: #EEE"| Project name
|style="background-color: #F2F2F2" align="center"|<html><img src="/images/9/94/Report.png" border="0" /></html> Main project page
<html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html>
|-
| colspan="2"|
|}