Klapperich Lab:Notebook/Lab Meeting Notes/2008/09/08: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
Cmklapperich (talk | contribs) |
Jaephil Do (talk | contribs) m (edited by Jaephil) |
||
Line 26: | Line 26: | ||
† COBRA <br> | † COBRA <br> | ||
* | * Mark finish control circuit (Temp, humidity, pressure) design and ordered parts <br> | ||
* Evaporation fixture will be picked up during this week, and assembled after comeback <br> | |||
* IBC for our lab revision submitted 9/4 <br> | * IBC for our lab revision submitted 9/4 <br> | ||
* Tests on chips with covers underway <br> | * Tests on chips with covers underway <br> | ||
Line 32: | Line 33: | ||
† Valve Array <br> | † Valve Array <br> | ||
* Waiting for fixture still from Melissa <br> | |||
* Waiting for fixture from Melissa <br> | * Need complete assembly picture before 14th, forward it to Jaephil for whitepaper<br> | ||
* | |||
* Basic software in place <br> | * Basic software in place <br> | ||
† Fraunhofer: LOAC <br> | † Fraunhofer: LOAC <br> | ||
Line 41: | Line 43: | ||
† Biointerfaces group <br> | † Biointerfaces group <br> | ||
* Brett | * Brett, Mincheol, Jaephil and Hussam had meeting and decided to try DRIE (by Brett) with SU-8 (by Mincheol) together <br> | ||
* i-line(365nm)has diffraction limiting resolution about 2um at best <br> | |||
* Mincheol will try the device as we have it <br> | * Mincheol will try the device as we have it <br> | ||
* Hussam, Brett and MinCheol are going to make a protocol for this process <br> | * Hussam, Brett and MinCheol are going to make a protocol for this process <br> | ||
Line 64: | Line 67: | ||
* STILL Working on a test chip to examine mat'ls compatibility <br> | * STILL Working on a test chip to examine mat'ls compatibility <br> | ||
* 50 microliter test chip made/ may be and issue getting the stuff out. Especially after the wash. <br> | * 50 microliter test chip made/ may be and issue getting the stuff out. Especially after the wash. <br> | ||
* | * Heiko, Sonali, and Jaephil write their own part in a whitepaper and forward it to Cathie by 14th. <br> | ||
† Senior project <br> | † Senior project <br> | ||
* New students will be recruited. <br> | * New students will be recruited. <br> | ||
* Megan works on micro membrane valve and pump development as sr project. <br> | |||
† F31: Cochlea <br> | † F31: Cochlea <br> |
Revision as of 17:25, 7 September 2008
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
8 September 2008 Lab Meeting Agenda† Announcements
† Flu R01
† SEPSIS Project/Chip Bonding Issues
†RNA project
† COBRA
† Valve Array
† Fraunhofer: LOAC
† Biointerfaces group
† CIMIT Flu
† PCR
† RCA
† Senior project
† F31: Cochlea † Silica Optimization (Lambda):
|