Klapperich Lab:Notebook/Lab Meeting Notes/2008/09/08: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
Cmklapperich (talk | contribs) |
Cmklapperich (talk | contribs) |
||
Line 58: | Line 58: | ||
* Waiting for new heaters to try again. Other brand was not good. Will use copper in the meantime for temp control. <br> | * Waiting for new heaters to try again. Other brand was not good. Will use copper in the meantime for temp control. <br> | ||
* '''PUMP problem.''' Speed control at low flow rates is not stable. <br> | * '''PUMP problem.''' Speed control at low flow rates is not stable. <br> | ||
* What are the specs on Wong's pump? <br> | * What are the specs on Wong's pump? More clamps for the syringe. 2 clamps, the secured syringe does not move. It can be set to 4 decimal places for the speed. Harvard Apparatus PHD2000 programmable.<br> | ||
* What are the specs on our pumps? <br> | * What are the specs on our pumps? <br> | ||
* Can KDS calibrate or fix it? <br> | * Can KDS calibrate or fix it? <br> | ||
Line 65: | Line 65: | ||
* QQ needs to <b>design a TaqMan Assay <b>for the lambda phage PCR <br> | * QQ needs to <b>design a TaqMan Assay <b>for the lambda phage PCR <br> | ||
* PEG results are good | |||
† RCA <br> | † RCA <br> |
Revision as of 06:58, 8 September 2008
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
8 September 2008 Lab Meeting Agenda† Announcements
† Flu R01
† SEPSIS Project/Chip Bonding Issues
†RNA project
† COBRA
† Valve Array
† Fraunhofer: LOAC
† Biointerfaces group
† CIMIT Flu
† PCR
† RCA
† Senior project
† F31: Cochlea † Silica Optimization (Lambda):
|