Klapperich Lab:Notebook/Lab Meeting Notes/2008/09/08: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
Cmklapperich (talk | contribs) |
Cmklapperich (talk | contribs) |
||
Line 56: | Line 56: | ||
* QQ Model has 30 cycles. MinCheol will try the model. Need to upgrade the Star-CD program. Dan Kamalic has to do this. <br> | * QQ Model has 30 cycles. MinCheol will try the model. Need to upgrade the Star-CD program. Dan Kamalic has to do this. <br> | ||
* Dan fixed Star-CD. <br> | * Dan fixed Star-CD. <br> | ||
* What are the specs on Wong's pump? More clamps for the syringe. 2 clamps, the secured syringe does not move. It can be set to 4 decimal places for the speed. Harvard Apparatus PHD2000 programmable.<br> | * What are the specs on Wong's pump? More clamps for the syringe. 2 clamps, the secured syringe does not move. It can be set to 4 decimal places for the speed. Harvard Apparatus PHD2000 programmable.<br> | ||
*<b>QQ get quote for PHD2000.<b><br> | |||
*QQ get | |||
* QQ needs to <b>design a TaqMan Assay <b>for the lambda phage PCR <br> | * QQ needs to <b>design a TaqMan Assay <b>for the lambda phage PCR <br> | ||
* PEG results are good but we need to get rid of the primer-dimers before publication <br> | * PEG results are good but we need to get rid of the primer-dimers before publication <br> |
Revision as of 07:14, 8 September 2008
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
8 September 2008 Lab Meeting Agenda† Announcements
† Flu R01
† SEPSIS Project/Chip Bonding Issues
†RNA project
† COBRA
† Valve Array
† Fraunhofer: LOAC
† Biointerfaces group
† CIMIT Flu
† PCR
† Senior project
† F31: Cochlea † Silica Optimization (Lambda):
|