Klapperich Lab:Notebook/Lab Meeting Notes/2008/09/23: Difference between revisions
Cmklapperich (talk | contribs) |
Cmklapperich (talk | contribs) |
||
Line 16: | Line 16: | ||
† Flu R01 <br> | † Flu R01 <br> | ||
* Meeting on 9/12<br> | * Meeting on 9/12<br> | ||
*1. We are not changing the sample collection procedures at this time.<br> | |||
2. We are aiming to get 200 samples this season, starting when flu hits North America as recorded by CDC website.<br> | |||
3. We may collect samples from anther ER location on BUMC campus.<br> | |||
4. We are going to hire a courier to transport the samples on scheduled days!!!<br> | |||
5. They want to know what "confirmed positive" samples we have from anti-sera assays (and we do, too), but I told them we are doing the plaque assay first and will move on to the anti-sera for a subset of the samples that were cytopathic positive starting likely in Nov.<br> | |||
6. We are still going to split the VTM in our hood and take it over there. <br> | |||
* Plaque assay. <br> | * Plaque assay. <br> | ||
Revision as of 07:53, 23 September 2008
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
23 September 2008 Lab Meeting Agenda† Announcements
† Flu R01
2. We are aiming to get 200 samples this season, starting when flu hits North America as recorded by CDC website.
† SEPSIS Project/Chip Bonding Issues
†RNA project
† COBRA
And demonstrate ability to deliver the specified amount from the microfluidics.
† Valve Array
† Fraunhofer: LOAC
† Biointerfaces group
† CIMIT Flu
† PCR
† Senior project
† F31: Cochlea † Silica Optimization (Lambda):
|