Klapperich Lab:Notebook/Lab Meeting Notes/2008/09/23: Difference between revisions
Cmklapperich (talk | contribs) |
Cmklapperich (talk | contribs) |
||
Line 13: | Line 13: | ||
* Room 720 needs to be kept clean. <br> | * Room 720 needs to be kept clean. <br> | ||
* Supply costs are out of control! Conserve. <br> | * Supply costs are out of control! Conserve. <br> | ||
<br> | |||
† Flu R01 <br> | † Flu R01 <br> | ||
* Meeting on 9/12<br> | * Meeting on 9/12<br> | ||
Line 23: | Line 23: | ||
6. We are still going to split the VTM in our hood and take it over there. <br> | 6. We are still going to split the VTM in our hood and take it over there. <br> | ||
* Plaque assay. <br> | * Plaque assay. <br> | ||
<br> | |||
† SEPSIS Project/'''Chip Bonding Issues''' <br> | † SEPSIS Project/'''Chip Bonding Issues''' <br> | ||
* What is the STD temperature and pressure for bonding??? We need to nail this down.<br> | * What is the STD temperature and pressure for bonding??? We need to nail this down.<br> | ||
* What material are the plaques made out of? We should try to get resin that is the same material as the plaques that we bought (JP) <br> | * What material are the plaques made out of? We should try to get resin that is the same material as the plaques that we bought (JP) <br> | ||
* We can think about building our own straw system like Fraunhofer's.<br> | * We can think about building our own straw system like Fraunhofer's.<br> | ||
<br> | |||
†RNA project | †RNA project | ||
* <br> | * <br> | ||
* Sonali will teach Stephanie Jurkat Culture. <br> | * Sonali will teach Stephanie Jurkat Culture. <br> | ||
<br> | |||
† COBRA <br> | † COBRA <br> | ||
* Mark finish control circuit (Temp, humidity, pressure) design and ordered parts <br> | * Mark finish control circuit (Temp, humidity, pressure) design and ordered parts <br> | ||
Line 40: | Line 40: | ||
* Tests on chips with covers underway <br> | * Tests on chips with covers underway <br> | ||
* Jane is investigating the multilayer design <br> | * Jane is investigating the multilayer design <br> | ||
<br> | |||
† Valve Array <br> | † Valve Array <br> | ||
* Waiting for fixture still from Melissa <br> | * Waiting for fixture still from Melissa <br> | ||
* <br> | * <br> | ||
* <br> | * <br> | ||
<br> | |||
† Fraunhofer: LOAC <br> | † Fraunhofer: LOAC <br> | ||
* Still Still troubleshooting <br> | * Still Still troubleshooting <br> | ||
<br> | |||
† Biointerfaces group <br> | † Biointerfaces group <br> | ||
* Brett, Mincheol, Jaephil and Hussam had meeting and decided to try DRIE (by Brett) with SU-8 (by Mincheol) together <br> | * Brett, Mincheol, Jaephil and Hussam had meeting and decided to try DRIE (by Brett) with SU-8 (by Mincheol) together <br> | ||
Line 55: | Line 55: | ||
* Hussam, Brett and MinCheol are going to make a protocol for this process <br> | * Hussam, Brett and MinCheol are going to make a protocol for this process <br> | ||
* AZP 4620 from Clariant. Hussam will try this photoresist (positive) <br> | * AZP 4620 from Clariant. Hussam will try this photoresist (positive) <br> | ||
<br> | |||
† CIMIT Flu<br> | † CIMIT Flu<br> | ||
* Met with Sepsis Nurse Tuesday. Preliminary plan for IRB submission at Harvard in place. Target date 1/1/09<br> | * Met with Sepsis Nurse Tuesday. Preliminary plan for IRB submission at Harvard in place. Target date 1/1/09<br> | ||
* | * | ||
<br> | |||
† PCR <br> | † PCR <br> | ||
* QQ Model has 30 cycles. MinCheol will try the model. Need to upgrade the Star-CD program. Dan Kamalic has to do this. <br> | * QQ Model has 30 cycles. MinCheol will try the model. Need to upgrade the Star-CD program. Dan Kamalic has to do this. <br> | ||
Line 68: | Line 68: | ||
* PEG results are good but we need to get rid of the primer-dimers before publication <br> | * PEG results are good but we need to get rid of the primer-dimers before publication <br> | ||
<br> | |||
† RCA <br> | † RCA <br> | ||
* STILL Working on a test chip to examine mat'ls compatibility <br> | * STILL Working on a test chip to examine mat'ls compatibility <br> | ||
* 50 microliter test chip made/ may be and issue getting the stuff out. Especially after the wash. <br> | * 50 microliter test chip made/ may be and issue getting the stuff out. Especially after the wash. <br> | ||
* Heiko, Sonali, and Jaephil write their own part in a whitepaper and forward it to Cathie by 14th. <br> | * Heiko, Sonali, and Jaephil write their own part in a whitepaper and forward it to Cathie by 14th. <br> | ||
<br> | |||
† Senior project <br> | † Senior project <br> | ||
* New students will be recruited. <br> | * New students will be recruited. <br> | ||
* Megan works on micro membrane valve and pump development as sr project. <br> | * Megan works on micro membrane valve and pump development as sr project. <br> | ||
<br> | |||
† F31: Cochlea <br> | † F31: Cochlea <br> | ||
<br> | |||
† Silica Optimization (Lambda): <br> | † Silica Optimization (Lambda): <br> | ||
* Ongoing <br> | * Ongoing <br> |
Revision as of 07:54, 23 September 2008
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
23 September 2008 Lab Meeting Agenda† Announcements
2. We are aiming to get 200 samples this season, starting when flu hits North America as recorded by CDC website.
† COBRA
And demonstrate ability to deliver the specified amount from the microfluidics.
|