Klapperich Lab:Notebook/Lab Meeting Notes/2008/09/23: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
Line 13: Line 13:
* Room 720 needs to be kept clean. <br>
* Room 720 needs to be kept clean. <br>
* Supply costs are out of control! Conserve. <br>
* Supply costs are out of control! Conserve. <br>
 
<br>
† Flu R01 <br>
† Flu R01 <br>
* Meeting on 9/12<br>
* Meeting on 9/12<br>
Line 23: Line 23:
6. We are still going to split the VTM in our hood and take it over there. <br>
6. We are still going to split the VTM in our hood and take it over there. <br>
* Plaque assay. <br>
* Plaque assay. <br>
 
<br>
† SEPSIS Project/'''Chip Bonding Issues''' <br>
† SEPSIS Project/'''Chip Bonding Issues''' <br>
* What is the STD temperature and pressure for bonding??? We need to nail this down.<br>
* What is the STD temperature and pressure for bonding??? We need to nail this down.<br>
* What material are the plaques made out of? We should try to get resin that is the same material as the plaques that we bought (JP) <br>
* What material are the plaques made out of? We should try to get resin that is the same material as the plaques that we bought (JP) <br>
* We can think about building our own straw system like Fraunhofer's.<br>
* We can think about building our own straw system like Fraunhofer's.<br>
 
<br>
†RNA project
†RNA project
* <br>
* <br>
* Sonali will teach Stephanie Jurkat Culture. <br>
* Sonali will teach Stephanie Jurkat Culture. <br>
   
  <br>
† COBRA <br>
† COBRA <br>
* Mark finish control circuit (Temp, humidity, pressure) design and ordered parts <br>  
* Mark finish control circuit (Temp, humidity, pressure) design and ordered parts <br>  
Line 40: Line 40:
* Tests on chips with covers underway <br>
* Tests on chips with covers underway <br>
* Jane is investigating the multilayer design <br>
* Jane is investigating the multilayer design <br>
 
<br>
† Valve Array <br>
† Valve Array <br>
* Waiting for fixture still from Melissa <br>
* Waiting for fixture still from Melissa <br>
* <br>
* <br>
* <br>
* <br>
 
<br>
† Fraunhofer: LOAC <br>
† Fraunhofer: LOAC <br>
* Still Still troubleshooting <br>
* Still Still troubleshooting <br>
 
<br>
† Biointerfaces group <br>
† Biointerfaces group <br>
* Brett, Mincheol, Jaephil and Hussam had meeting and decided to try DRIE (by Brett) with SU-8 (by Mincheol) together <br>
* Brett, Mincheol, Jaephil and Hussam had meeting and decided to try DRIE (by Brett) with SU-8 (by Mincheol) together <br>
Line 55: Line 55:
* Hussam, Brett and MinCheol are going to make a protocol for this process <br>
* Hussam, Brett and MinCheol are going to make a protocol for this process <br>
* AZP 4620 from Clariant. Hussam will try this photoresist (positive) <br>
* AZP 4620 from Clariant. Hussam will try this photoresist (positive) <br>
 
<br>
† CIMIT Flu<br>
† CIMIT Flu<br>
* Met with Sepsis Nurse Tuesday. Preliminary plan for IRB submission at Harvard in place. Target date 1/1/09<br>
* Met with Sepsis Nurse Tuesday. Preliminary plan for IRB submission at Harvard in place. Target date 1/1/09<br>
*  
*  
 
<br>
† PCR <br>
† PCR <br>
* QQ Model has 30 cycles. MinCheol will try the model. Need to upgrade the Star-CD program. Dan Kamalic has to do this. <br>
* QQ Model has 30 cycles. MinCheol will try the model. Need to upgrade the Star-CD program. Dan Kamalic has to do this. <br>
Line 68: Line 68:
* PEG results are good but we need to get rid of the primer-dimers before publication <br>
* PEG results are good but we need to get rid of the primer-dimers before publication <br>


 
<br>
† RCA <br>
† RCA <br>
* STILL Working on a test chip to examine mat'ls compatibility <br>
* STILL Working on a test chip to examine mat'ls compatibility <br>
* 50 microliter test chip made/ may be and issue getting the stuff out. Especially after the wash. <br>
* 50 microliter test chip made/ may be and issue getting the stuff out. Especially after the wash. <br>
* Heiko, Sonali, and Jaephil write their own part in a whitepaper and forward it to Cathie by 14th. <br>
* Heiko, Sonali, and Jaephil write their own part in a whitepaper and forward it to Cathie by 14th. <br>
 
<br>
† Senior project <br>
† Senior project <br>
* New students will be recruited. <br>
* New students will be recruited. <br>
* Megan works on micro membrane valve and pump development as sr project. <br>
* Megan works on micro membrane valve and pump development as sr project. <br>
 
<br>
† F31: Cochlea <br>
† F31: Cochlea <br>
 
<br>
† Silica Optimization (Lambda): <br>
† Silica Optimization (Lambda): <br>
* Ongoing <br>
* Ongoing <br>

Revision as of 07:54, 23 September 2008

Project name <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page
<html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html>

23 September 2008 Lab Meeting Agenda

† Announcements

  • Fall Group Meetings will be on Tuesdays from 12-2pm in room 705
  • Register for CIMIT conference if you want. Irene can reimburse.
  • Register for MRS Boston if you want to.
  • Room 720 needs to be kept clean.
  • Supply costs are out of control! Conserve.


† Flu R01

  • Meeting on 9/12
  • 1. We are not changing the sample collection procedures at this time.

2. We are aiming to get 200 samples this season, starting when flu hits North America as recorded by CDC website.
3. We may collect samples from anther ER location on BUMC campus.
4. We are going to hire a courier to transport the samples on scheduled days!!!
5. They want to know what "confirmed positive" samples we have from anti-sera assays (and we do, too), but I told them we are doing the plaque assay first and will move on to the anti-sera for a subset of the samples that were cytopathic positive starting likely in Nov.
6. We are still going to split the VTM in our hood and take it over there.

  • Plaque assay.


† SEPSIS Project/Chip Bonding Issues

  • What is the STD temperature and pressure for bonding??? We need to nail this down.
  • What material are the plaques made out of? We should try to get resin that is the same material as the plaques that we bought (JP)
  • We can think about building our own straw system like Fraunhofer's.


†RNA project


  • Sonali will teach Stephanie Jurkat Culture.

† COBRA

  • Mark finish control circuit (Temp, humidity, pressure) design and ordered parts
  • Evaporation fixture will be picked up during this week, and assembled after comeback
  • HELEN says: Jaephil should take a representative sample of what Alexis proposed to be your input: 100 uL of DI water with bacteria (MSSA should be our bacteria)

And demonstrate ability to deliver the specified amount from the microfluidics.

  • Tests on chips with covers underway
  • Jane is investigating the multilayer design


† Valve Array

  • Waiting for fixture still from Melissa



† Fraunhofer: LOAC

  • Still Still troubleshooting


† Biointerfaces group

  • Brett, Mincheol, Jaephil and Hussam had meeting and decided to try DRIE (by Brett) with SU-8 (by Mincheol) together
  • i-line(365nm)has diffraction limiting resolution about 2um at best
  • Mincheol will try the device as we have it
  • Hussam, Brett and MinCheol are going to make a protocol for this process
  • AZP 4620 from Clariant. Hussam will try this photoresist (positive)


† CIMIT Flu

  • Met with Sepsis Nurse Tuesday. Preliminary plan for IRB submission at Harvard in place. Target date 1/1/09


† PCR

  • QQ Model has 30 cycles. MinCheol will try the model. Need to upgrade the Star-CD program. Dan Kamalic has to do this.
  • Dan fixed Star-CD.
  • What are the specs on Wong's pump? More clamps for the syringe. 2 clamps, the secured syringe does not move. It can be set to 4 decimal places for the speed. Harvard Apparatus PHD2000 programmable.
  • PHD2000.ordered very expensive....respect it!
  • QQ needs to design a TaqMan Assay for the lambda phage PCR
  • PEG results are good but we need to get rid of the primer-dimers before publication


† RCA

  • STILL Working on a test chip to examine mat'ls compatibility
  • 50 microliter test chip made/ may be and issue getting the stuff out. Especially after the wash.
  • Heiko, Sonali, and Jaephil write their own part in a whitepaper and forward it to Cathie by 14th.


† Senior project

  • New students will be recruited.
  • Megan works on micro membrane valve and pump development as sr project.


† F31: Cochlea

† Silica Optimization (Lambda):

  • Ongoing