Klapperich Lab:Notebook/Lab Meeting Notes/2008/10/07: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
(6 intermediate revisions by one other user not shown)
Line 16: Line 16:
† Flu R01 <br>
† Flu R01 <br>
* More sample back? Can we put in 1.5 ml saline, collect in 3ml VTM tube directly?  YES. Cathie will amend. <br>
* More sample back? Can we put in 1.5 ml saline, collect in 3ml VTM tube directly?  YES. Cathie will amend. <br>
* Plaque assay status. <br>
* Plaque assay status. Redo . Too dilute.<br>
* Cathie STILL STILL has to submit the progress report to INSPIR. <br>
* Cathie STILL STILL has to submit the progress report to INSPIR. <br>
<br>
<br>
Line 29: Line 29:
†RNA project
†RNA project
* Jeff Braman will visit in early Dec. <br>
* Jeff Braman will visit in early Dec. <br>
* SM and AC will do first experiment on Friday. Update? <br>
* SM and AC did the first experiments this week. RNA obtained. Looks clean. <br>
* Do dilutions. Send to Bioanalyzer. <br>
  <br>
  <br>
† COBRA <br>
† COBRA <br>
* Mark finish control circuit (Temp, humidity, pressure) design and ordered parts <br>  
* Mark finish control circuit <br>  
* Fluorescence microscopy available from 720. Try beads experiment. Update? <br>
* Fluorescence microscopy available from 720. Try beads experiment. Update? <br>
* Cutter plotter arrived.<br>
* Cutter plotter arrived.<br>
Line 51: Line 52:
<br>
<br>
† Biointerfaces group <br>
† Biointerfaces group <br>
* Make a mold for Brett this week. When mask is made. <br>
* Mold still not made. Mask potentially Wed AM. When mask is made. <br>
* Do preliminary E. coli experiment soon. <br>
* Do preliminary E. coli experiment soon. Sonali will train. <br>
* Making a CR mask Tuesday afternoon. <br>
<br>
<br>
† CIMIT- Colson Grant<br>
† CIMIT- Colson Grant<br>
Line 62: Line 62:
* Physical PCR areas defined in 709 (check with Sonali). <br>
* Physical PCR areas defined in 709 (check with Sonali). <br>
* QQ continued with Taqman assays. <br>
* QQ continued with Taqman assays. <br>
* '''Contamination. Make an internal control on the chip.''' <br>  
* QQ will run it on a gel to check. <br>
* Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed (JD) <br>
* '''Run Gels for water Wash steps - show me and Sonali''' <br>  
* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture. <br>
* Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed - Will try after fixes and report next week. <br>
'''* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture. <br>'''
* MinCheol is making Four simple PCR models to optimize temperature distribution along to the channel. Will do another model with the insulation on the bottom. <br>
* MinCheol is making Four simple PCR models to optimize temperature distribution along to the channel. Will do another model with the insulation on the bottom. <br>
* MinCheol is simulating DNA's Residence Time for simple PCR models. The DNA particles need to be much smaller. Also, consult the Lab on Chip paper that JD mentioned. <br>
* MinCheol is simulating DNA's Residence Time for simple PCR models. The DNA particles need to be much smaller. Also, consult the Lab on Chip paper that JD mentioned. <br>
 
* Have a PCR only meeting sometime next week. <br>
* Qingqing has to do experiments with MinCheol's designs. <br>
<br>
<br>
† RCA <br>
† RCA <br>
Line 74: Line 76:
† Senior project <br>
† Senior project <br>
* Megan ordering oligos and primers for the RCA. Quote. Check with Heiko on his sources. <br>
* Megan ordering oligos and primers for the RCA. Quote. Check with Heiko on his sources. <br>
* Haven't seen Teddy yet. <br>
* Haven't seen Teddy yet. What is up with him? <br>
<br>
<br>
<br>
† F31: Cochlea <br>
† F31: Cochlea <br>
* ARO Abstract submitted. <br>
* ARO Abstract submitted. <br>
* Data summary focusing on the fundamental biological questions for next week. <br>
* Data summary focusing on the fundamental biological questions for next week. <br>
<br>
<br>
† Silica Optimization (Lambda): <br>
† Silica Optimization (Lambda): <br>
* Ongoing. More concentrations. Forged chips. <br>
* Ongoing. More concentrations. Forged chips. <br>
* Pressure testing on these channels when they are flowing. <br>
* Pressure testing on these channels when they are flowing. <br>
[http://openwetware.org/wiki/Image:Progress_9-29_to_10-5.doc hussam's update] <br>


<!-- ##### DO NOT edit below this line unless you know what you are doing. ##### -->
<!-- ##### DO NOT edit below this line unless you know what you are doing. ##### -->

Revision as of 09:06, 8 October 2008

Project name <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page
<html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html>

7 October 2008 Lab Meeting Agenda

† Sonali's research report today.

† Announcements

  • A slow migration to 709 can now begin.
  • JZ and JD out next week at mTAS.


† Flu R01

  • More sample back? Can we put in 1.5 ml saline, collect in 3ml VTM tube directly? YES. Cathie will amend.
  • Plaque assay status. Redo . Too dilute.
  • Cathie STILL STILL has to submit the progress report to INSPIR.


† SEPSIS Project - CIMIT Bird Flu

  • Sample (raw pellets and film) from Ticona COC ordered.
  • B sub in blood is done. Lets talk about comepleting the gram positive plots so they "match."
  • SEM image analysis of pore size. Progress?
  • Run E. coli RT-PCR using primers for a genomic target.
  • Report DNA amounts along with the RT-PCR data for the Sepsis paper.
  • Tube meeting took place last week. More to come.


†RNA project

  • Jeff Braman will visit in early Dec.
  • SM and AC did the first experiments this week. RNA obtained. Looks clean.
  • Do dilutions. Send to Bioanalyzer.

† COBRA

  • Mark finish control circuit
  • Fluorescence microscopy available from 720. Try beads experiment. Update?
  • Cutter plotter arrived.
  • Jane, Cathie, Larry, Ranjith will meet soon to discuss scale up of sol gel in chip process.
  • Discuss dispensing from evap chip in a real world way.
  • Current design gives E.coli signal, clotting is still a problem
  • Change of design: funnel-shaped wells, smooth hole, make samples in pipette tips?


† Valve Array/Valve building (FJ)

  • Waiting for fixture still from Melissa. Hopefully this week.
  • Update: Monday 6 Oct Haven't heard anything from Shane yet. Attempting to contact again, so far without success.


† Fraunhofer: LOAC

  • Update?
  • Alex working on more toluene bonding issues.
  • Try Ticona material. (HM, JD, AG)
  • Still Still Still troubleshooting ??


† Biointerfaces group

  • Mold still not made. Mask potentially Wed AM. When mask is made.
  • Do preliminary E. coli experiment soon. Sonali will train.


† CIMIT- Colson Grant

  • Preliminary plan for IRB submission at Harvard in place. Target date 1/1/09
  • STAR-CD Renewal - January ($2K)


† PCR

  • Physical PCR areas defined in 709 (check with Sonali).
  • QQ continued with Taqman assays.
  • QQ will run it on a gel to check.
  • Run Gels for water Wash steps - show me and Sonali
  • Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed - Will try after fixes and report next week.

* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture.

  • MinCheol is making Four simple PCR models to optimize temperature distribution along to the channel. Will do another model with the insulation on the bottom.
  • MinCheol is simulating DNA's Residence Time for simple PCR models. The DNA particles need to be much smaller. Also, consult the Lab on Chip paper that JD mentioned.
  • Have a PCR only meeting sometime next week.
  • Qingqing has to do experiments with MinCheol's designs.


† RCA

  • Cathie Still Still Working on Whitepaper almost done!


† Senior project

  • Megan ordering oligos and primers for the RCA. Quote. Check with Heiko on his sources.
  • Haven't seen Teddy yet. What is up with him?


† F31: Cochlea

  • ARO Abstract submitted.
  • Data summary focusing on the fundamental biological questions for next week.


† Silica Optimization (Lambda):

  • Ongoing. More concentrations. Forged chips.
  • Pressure testing on these channels when they are flowing.


hussam's update