Line 38: Line 38:
† Valve Array/Valve building (FJ) <br>
† Valve Array/Valve building (FJ) <br>
* Waiting for fixture still from Melissa. Hopefully this week. <br>
* Waiting for fixture still from Melissa. Hopefully this week. <br>
* Update: Monday 29 Sept Frank contacted Shane Conran of Superior Fluid Solutions (referred by Jess from UCSB).  Will draw up preliminary design and send to us for evaluation. <br>
* Update: Monday 6 Oct Haven't heard anything from Shane yet.  Attempting to contact again, so far without success.<br>
* Update: Monday 6 Oct Haven't heard anything from Shane yet.  Attempting to contact again, so far without success.<br>
<br>
<br>
† Fraunhofer: LOAC <br>
† Fraunhofer: LOAC <br>
* Alex working with Paul. (something called personal lubricant)<br>
* Update? <br>
* Alex working on more toluene bonding issues. <br>
* Alex working on more toluene bonding issues. <br>
* Try Ticona material. (HM, JD, AG) <br>
* Try Ticona material. (HM, JD, AG) <br>
Line 57: Line 56:
<br>
<br>
† PCR <br>
† PCR <br>
* PCR areas defined. Protocols reviewed. Contamination issues discussed.... <br>
* Physical PCR areas defined in 709 (check with Sonali). <br>
* QQ tested Taqman assays. Two probe sets. One set is better than the other. <br>
* QQ continued with Taqman assays. <br>
* '''Contamination. Make an internal control on the chip.''' <br>  
* '''Contamination. Make an internal control on the chip.''' <br>  
* Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed (JD) <br>
* Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed (JD) <br>
Line 67: Line 66:
<br>
<br>
† RCA <br>
† RCA <br>
* Cathie Still Working on Whitepaper almost done! <br>
* Cathie Still Still Working on Whitepaper almost done! <br>
* Send PAs to Sonali and Jaephil for sending RCA grant on to someplace else. <br>
<br>
<br>
† Senior project <br>
† Senior project <br>
Line 76: Line 74:
<br>
<br>
† F31: Cochlea <br>
† F31: Cochlea <br>
* ARO Abstract due October 1st. <br>
* ARO Abstract submitted. <br>
* Data summary focusing on the fundamental biological questions for next week. <br>
* Data summary focusing on the fundamental biological questions for next week. <br>



Revision as of 09:31, 7 October 2008

Project name <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page
<html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html>

7 October 2008 Lab Meeting Agenda

† Sonali's research report today.

† Announcements

  • A slow migration to 709 can now begin.


† Flu R01

  • More sample back? Can we put in 1.5 ml saline, collect in 3ml VTM tube directly? YES. Cathie will amend.
  • Plaque assay status.
  • Cathie STILL STILL has to submit the progress report to INSPIR.


† SEPSIS Project - CIMIT Bird Flu

  • Sample (raw pellets and film) from Ticona COC ordered.
  • B sub in blood is done. Lets talk about comepleting the gram positive plots so they "match."
  • SEM image analysis of pore size. Progress?


†RNA project

  • Jeff Braman will visit in early Dec.
  • SM and AC will do first experiment on Friday. Update?

† COBRA

  • Mark finish control circuit (Temp, humidity, pressure) design and ordered parts
  • Fluorescence microscopy available from 720. Try beads experiment. Update?
  • Cutter plotter arrived.
  • Jane, Cathie, Larry, Ranjith will meet soon to discuss scale up of sol gel in chip process.
  • Discuss dispensing from evap chip in a real world way.
  • Current design gives E.coli signal, clotting is still a problem
  • Change of design: funnel-shaped wells, smooth hole, make samples in pipette tips?


† Valve Array/Valve building (FJ)

  • Waiting for fixture still from Melissa. Hopefully this week.
  • Update: Monday 6 Oct Haven't heard anything from Shane yet. Attempting to contact again, so far without success.


† Fraunhofer: LOAC

  • Update?
  • Alex working on more toluene bonding issues.
  • Try Ticona material. (HM, JD, AG)
  • Still Still Still troubleshooting ??


† Biointerfaces group

  • Make a mold for Brett this week. When mask is made.
  • Do preliminary E. coli experiment soon.
  • Making a CR mask Tuesday afternoon.


† CIMIT- Colson Grant

  • Preliminary plan for IRB submission at Harvard in place. Target date 1/1/09
  • STAR-CD Renewal - January ($2K)


† PCR

  • Physical PCR areas defined in 709 (check with Sonali).
  • QQ continued with Taqman assays.
  • Contamination. Make an internal control on the chip.
  • Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed (JD)
  • Fixuture for PCR chip. The heater and the thermocouples would be on the fixture.
  • MinCheol is making Four simple PCR models to optimize temperature distribution along to the channel. Will do another model with the insulation on the bottom.
  • MinCheol is simulating DNA's Residence Time for simple PCR models. The DNA particles need to be much smaller. Also, consult the Lab on Chip paper that JD mentioned.


† RCA

  • Cathie Still Still Working on Whitepaper almost done!


† Senior project

  • Megan ordering oligos and primers for the RCA. Quote. Check with Heiko on his sources.
  • Haven't seen Teddy yet.



† F31: Cochlea

  • ARO Abstract submitted.
  • Data summary focusing on the fundamental biological questions for next week.


† Silica Optimization (Lambda):

  • Ongoing. More concentrations. Forged chips.
  • Pressure testing on these channels when they are flowing.