Klapperich Lab:Notebook/Lab Meeting Notes/2008/10/14: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
Cmklapperich (talk | contribs) No edit summary |
|||
Line 37: | Line 37: | ||
† Valve Array/Valve building (FJ) <br> | † Valve Array/Valve building (FJ) <br> | ||
* Waiting for fixture still from Melissa. Hopefully this week. UPDATE? <br> | * Waiting for fixture still from Melissa. Hopefully this week. UPDATE? <br> | ||
* | * 9 Oct Shane says schematics are completed and would be emailed "right away". Have not received anything. Will contact 14 Oct to figure out why.<br> | ||
<br> | <br> | ||
† Fraunhofer: LOAC <br> | † Fraunhofer: LOAC <br> |
Revision as of 09:10, 13 October 2008
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
14 October 2008 Lab Meeting Agenda† MinCheol's research report today. † Announcements
† COBRA
* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture.
|