Klapperich Lab:Notebook/Lab Meeting Notes/2008/10/14: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
Cmklapperich (talk | contribs) (Autocreate 2008/10/14 Entry for Klapperich_Lab:Notebook/Lab_Meeting_Notes) |
|||
(3 intermediate revisions by 3 users not shown) | |||
Line 7: | Line 7: | ||
<!-- ##### DO NOT edit above this line unless you know what you are doing. ##### --> | <!-- ##### DO NOT edit above this line unless you know what you are doing. ##### --> | ||
==14 October 2008 Lab Meeting Agenda== | |||
† MinCheol's research report today. | |||
† Announcements<br> | |||
* JZ and JD out this week at mTAS. <br> | |||
<br> | |||
† Flu R01 <br> | |||
* TO DO More sample back? Can we put in 1.5 ml saline, collect in 3ml VTM tube directly? YES. Cathie will amend. <br> | |||
* Plaque assay status?<br> | |||
* TO DO Cathie STILL STILL has to submit the progress report to INSPIR. <br> | |||
<br> | |||
† SEPSIS Project - CIMIT Bird Flu <br> | |||
* B sub in blood is done. Lets talk about comepleting the gram positive plots so they "match." <br> | |||
* SEM image analysis of pore size. DONE. Thanks JZ<br> | |||
* Run E. coli RT-PCR using primers for a genomic target.<br> | |||
* Report DNA amounts along with the RT-PCR data for the Sepsis paper.<br> | |||
<br> | |||
†RNA project | |||
* Jeff Braman will visit in early Dec. <br> | |||
* <br> | |||
* Do dilutions. Send to Bioanalyzer. <br> | |||
<br> | |||
† COBRA <br> | |||
* Mark finish control circuit <br> | |||
* Fluorescence microscopy available from 720. Try beads experiment. DONE. <br> | |||
* Bacteria Experiment? <br> | |||
* Jane, Cathie, Larry, Ranjith met Friday. JZ will try process with modified washes. <br> | |||
<br> | |||
† Valve Array/Valve building (FJ) <br> | |||
* Waiting for fixture still from Melissa. Hopefully this week. UPDATE? <br> | |||
* 9 Oct Shane says schematics are completed and would be emailed "right away". Have not received anything. Will contact 14 Oct to figure out why.<br> | |||
<br> | |||
† Fraunhofer: LOAC <br> | |||
* Update? <br> | |||
* Alex working on more toluene bonding issues. <br> | |||
* Try Ticona material. (HM, JD, AG) <br> | |||
* Still Still Still troubleshooting '''??'''<br> | |||
<br> | |||
† Biointerfaces group <br> | |||
* Mold still not made. Mask potentially Wed AM. When mask is made. <br> | |||
* Do preliminary E. coli experiment soon. Sonali will train. <br> | |||
<br> | |||
† CIMIT- Colson Grant<br> | |||
* Preliminary plan for IRB submission at Harvard in place. Target date 1/1/09<br> | |||
* STAR-CD Renewal - January ($2K)<br> | |||
<br> | |||
† PCR <br> | |||
* <br> | |||
* QQ will run it on a gel to check. <br> | |||
* '''Run Gels for water Wash steps - show me and Sonali''' UPDATE? <br> | |||
* Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed - Will try after fixes and report next week. UPDATE? <br> | |||
'''* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture. <br>''' | |||
* Qingqing has to do experiments with MinCheol's designs. AS SOON AS CLEANING CONTEROLS ARE IN PLACE. <br> | |||
<br> | |||
† RCA <br> | |||
* Cathie Still Still Working on Whitepaper. <br> | |||
<br> | |||
† Senior project <br> | |||
* Megan ordering oligos and primers for the RCA. Quote. Check with Heiko on his sources. <br> | |||
* Haven't seen Teddy yet. What is up with him? <br> | |||
<br> | |||
† F31: Cochlea <br> | |||
* | |||
* <br> | |||
<br> | |||
† Silica Optimization (Lambda): <br> | |||
* Ongoing. More concentrations. . <br> | |||
* Pressure testing on these channels when they are flowing. <br> | |||
[http://openwetware.org/wiki/Image:Progress_10-6_to_10-12.doc hussam's update ] <br> | |||
<!-- ##### DO NOT edit below this line unless you know what you are doing. ##### --> | <!-- ##### DO NOT edit below this line unless you know what you are doing. ##### --> |
Revision as of 09:01, 14 October 2008
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
14 October 2008 Lab Meeting Agenda† MinCheol's research report today. † Announcements
† COBRA
* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture.
|