Klapperich Lab:Notebook/Lab Meeting Notes/2008/11/04: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
Cmklapperich (talk | contribs) No edit summary |
|||
Line 33: | Line 33: | ||
† Valve Array/Valve building (FJ) <br> | † Valve Array/Valve building (FJ) <br> | ||
* Waiting for fixture still from Melissa. Hopefully this week. UPDATE? <br> | * Waiting for fixture still from Melissa. Hopefully this week. UPDATE? <br> | ||
* | * Received schematic and quote. Frank met with Dr. Do to go over schematic and see what's next. Met with Sonali (3 Nov) to better delineate system requirements, will meet with Mark to coordinate fixture/pressure-driven flow system interfacing before submitting revised specs to Superior Fluid Solutions.<br> | ||
<br> | <br> | ||
† Fraunhofer: LOAC <br> | † Fraunhofer: LOAC <br> |
Revision as of 19:52, 3 November 2008
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
4 November 2008 Lab Meeting Agenda† Mark's research report today. † Announcements
† COBRA
* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture.
|