Klapperich Lab:Notebook/Lab Meeting Notes/2008/11/11

From OpenWetWare
Revision as of 11:36, 10 November 2008 by Cmklapperich (talk | contribs)
Jump to navigationJump to search
Project name <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page
<html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html>

11 November 2008 Lab Meeting Agenda

† Hussam's research report today.

† Announcements

  • Your personal priorities have been emailed to you by me. Please take note.


† Flu R01

  • Courier service! Sample transport set up.
  • Plaque assay status?
  • Mark - status of fixture?


† SEPSIS Project - CIMIT Bird Flu

  • Cathie working on paper.


†RNA project

  • Jeff Braman will visit in early Dec.
  • Do cDNA prep. Spec, gels, send to Jeff B.

† COBRA

  • Mark- Control circuit?
  • Bacteria Experiment - Update from Jane and Jaephil?
  • Substrates - JZ to try with more gold and do all SEM/sample testing.


† Valve Array/Valve building (FJ)

  • Status from Mark?
  • Frank should talk with Alex, Mark, and Jaephil and make sure we are not duplicating efforts/making something that is too big for portability.


† Fraunhofer: LOAC

  • Primer/dimer issue. Talked with QQ. We do not appear to have this problem with our chips.


† Biointerfaces group

  • Paul Mak told that Mask aligner at Photonics center has UV filter. Try that machine. - UPDATE?
  • Preliminary E. coli experiment is ongoing. UPDATE?
  • Try DAPI bacteria stain to visualize e-coli soon. UPDATE?


† CIMIT- Colson Grant

  • Preliminary plan for IRB submission at Harvard in place. Target date 1/1/09
  • STAR-CD Renewal - January ($2K)


† PCR

  • QQ gel issues. Stop using ABI flu probe that QQ ordered. Try Cathie's old assay before designing a new one. Run gels.
  • Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed - Will try after fixes and report next week. UPDATE?

* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture.

  • MinCheol's desgins. UPDATE?
  • Mincheol will work on DNA migration simulation after IMECE 2008.


† RCA

  • Cathie submitted One pager Whitepaper. Waiting for response.


† Senior project

  • Need updates from both Senior project students in bullet form.
  • Emailed Teddy.


† F31: Cochlea

  • Received paper edits from Doug.
  • Make changes and give to Cathie ASAP.
  • Journal chosen?
  • Need to order Alpha-Tectorin protein.


† Silica Optimization (Lambda):

  • Ongoing. More concentrations.
  • Pressure testing on these channels when they are flowing.