Klapperich Lab:Notebook/Lab Meeting Notes/2008/12/09: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
Line 9: Line 9:
==9 December 2008 Lab Meeting Agenda==
==9 December 2008 Lab Meeting Agenda==
† Stephanie's research report today.
† Stephanie's research report today.
* check with b&G about compressed air and vacuum?


† Announcements<br>
† Announcements<br>
Line 17: Line 19:
† Flu R01 <br>
† Flu R01 <br>
* First samples ? <br>
* First samples ? <br>
* Plaque Assay - first samples today. Ref stock 2x10^4 pfu/ml <br>
* Plaque Assay <br>
* Alex needs to be trained to make SU molds. Trained to make the monoliths. <br>
* Alex needs to be trained to make SU molds. Trained to make the monoliths. <br>
* Hussam: Flu fixture done. <br>
* Hussam: Flu fixture done. <br>
*  
*  
<br>
<br>
† SEPSIS Project - CIMIT Bird Flu <br>
† SEPSIS Project <br>
* Sonali  working on first draft of new version paper.<br>
* Sonali  working on first draft of new version paper by 12/25. Journal?<br>
<br>
<br>
†RNA project
†RNA project

Revision as of 11:14, 9 December 2008

Project name <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page
<html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html>

9 December 2008 Lab Meeting Agenda

† Stephanie's research report today.

  • check with b&G about compressed air and vacuum?

† Announcements

  • Meeting on 12/16.
  • No meeting on 12/23
  • Meeting Time for Spring Semester (starting week of 1/16). Put your NOT OPEN times here.


† Flu R01

  • First samples ?
  • Plaque Assay
  • Alex needs to be trained to make SU molds. Trained to make the monoliths.
  • Hussam: Flu fixture done.


† SEPSIS Project

  • Sonali working on first draft of new version paper by 12/25. Journal?


†RNA project

  • Jeff Braman will visit December 12th. 9:30am Visit to Cathie's lab and lab tour. Meetings starting at 10am in Fraunhofer. Sonali and Cathie to attend.
  • Do cDNA prep. Spec, gels, send to Jeff B. Shipping?

† COBRA

  • Mark- Control circuit - This will be done by January.
  • Evap quantification experiments ongoing. (JD, JZ)
  • Substrates (JZ)


† Valve Array/Valve building (FJ)

  • Turn over platform to Teddy



† Fraunhofer: LOAC

  • So close!


† Biointerfaces group


  • E. Coli experiments with fluorescence.
  • Strobe experiments? Jason cannot do them, perhaps MK can.


† CIMIT- Colson Grant

  • First pages of first IRB started last week. Target date 1/1/09
  • STAR-CD Renewal - January ($2K)


† PCR


  • Improve the gel concentration 1.2% agarose. See if you can separate out primer dimers. UPDATE?
  • Look into Melting temp analysis on the 7300 - Done. what is contaminated?
  • Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed - helped a bit.

* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture.

  • Design new lambda phage assay with longer product.
  • What do we need to finish the paper?


† RCA

  • Cathie submitted One pager Whitepaper. Waiting for response.


† Senior project





† F31: Cochlea

  • Paper submitted.


† Silica Optimization (Lambda):