Klapperich Lab:Notebook/Lab Meeting Notes/2008/12/09

From OpenWetWare

(Difference between revisions)
Jump to: navigation, search
(9 December 2008 Lab Meeting Agenda)
(9 December 2008 Lab Meeting Agenda)
Line 8: Line 8:
==9 December 2008 Lab Meeting Agenda==
==9 December 2008 Lab Meeting Agenda==
 +
 +
Lab meeting, busy time slots, spring 09
 +
Hussam Mon, 10-2 pm  Wed 10-5 Fri 10-12
 +
      Tue, Thur 10-12  pm
 +
 +
 +
† Stephanie's research report today.
† Stephanie's research report today.

Revision as of 15:39, 10 December 2008

Project name Main project page
Previous entry      Next entry

9 December 2008 Lab Meeting Agenda

Lab meeting, busy time slots, spring 09 Hussam Mon, 10-2 pm Wed 10-5 Fri 10-12

      Tue, Thur 10-12  pm


† Stephanie's research report today.

  • check with b&G about compressed air and vacuum?

† Announcements

  • Put travel dates on lab calendar ASAP.
    .
  • Meeting on 12/16.
  • No meeting on 12/23
  • Meeting Time for Spring Semester (starting week of 1/16). Put your NOT OPEN times here.

Cathie T/TH 12-2pm.
Jane T 3-5


† Flu R01

  • First samples ?
  • Plaque Assay
  • Alex needs to be trained to make SU molds. Trained to make the monoliths (by Hussam By 1/15/09).
  • Hussam: Flu fixture done.


† SEPSIS Project

  • Sonali working on first draft of new version paper by 12/25. Journal?


†RNA project

  • Jeff Braman will visit December 12th. 9:30am Visit to Cathie's lab and lab tour. Meetings starting at 10am in Fraunhofer. Sonali and Cathie to attend.
  • Do cDNA prep. Spec, gels, send to Jeff B. Shipping?

† COBRA

  • Mark- Control circuit - This will be done by January.
  • Evap quantification experiments ongoing. Still working on live/dead assay. (JD, JZ)
  • Substrates (JZ)
  • DOE for the experiment.
  • Colloid experiment. inconclusive. Look at SEMs


† Valve Array/Valve building (FJ)

  • Turn over platform to Teddy



† Fraunhofer: LOAC

  • So close!


† Biointerfaces group


  • E. Coli experiments with fluorescence.
  • Strobe experiments? Jason cannot do them, perhaps MCK can. MCK will talk to Jason this week.


† CIMIT- Colson Grant

  • First pages of first IRB started last week. Target date 1/1/09
  • STAR-CD Renewal - January ($2K)


† PCR


  • Improve the gel concentration 1.2% agarose. See if you can separate out primer dimers. UPDATE?
  • Look into Melting temp analysis on the 7300 - Done. what is contaminated?
  • Only 1/5 chips are good at the hot embossing step. The vaccum chuck will be checked and o-rings changed - helped a bit. ON HOLD

* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture. ON HOLD

  • Try microscope for looking a fluor.
  • 52, 60, 65 C repeats.


† RCA

  • Cathie submitted One pager Whitepaper. Waiting for response.


† Senior project



† F31: Cochlea

  • Paper submitted.
  • set up adviser meeting Jan


† Silica Optimization (Lambda):

  • inhibition infor to Paul.
  • Replot the data so I can read it. ASAP
  • Do three elutions.
  • Next E. coli.


Personal tools