Klapperich Lab:Notebook/Lab Meeting Notes/2009/01/08: Difference between revisions
Cmklapperich (talk | contribs) No edit summary |
Cmklapperich (talk | contribs) |
||
Line 55: | Line 55: | ||
- needs much higher particle/bacteria ratio <br> | - needs much higher particle/bacteria ratio <br> | ||
- experiments outside the channel first? <br> | - experiments outside the channel first? <br> | ||
* Look at the unused substrates in SEM one week old or more. <br> | |||
* Prospectus framework/discussion: target the end of this week 1/23/09. <br> | * Prospectus framework/discussion: target the end of this week 1/23/09. <br> | ||
<br> | <br> | ||
† Valve Array/Valve building (FJ) <br> | † Valve Array/Valve building (FJ) <br> | ||
* | * Teddy on track. <br> | ||
<br> | <br> | ||
† Fraunhofer: LOAC <br> | † Fraunhofer: LOAC <br> | ||
Line 67: | Line 67: | ||
† Biointerfaces group <br> | † Biointerfaces group <br> | ||
* <br> | * <br> | ||
* Strobe experiments? Jason cannot do them, perhaps MCK can. MCK will talk to Jason this week. <br> | * Strobe experiments? Jason cannot do them, perhaps MCK can. MCK will talk to Jason this week. Look at the bacteria as they flow. <br> | ||
* CR mask was printed new design for trapper . <br> | * CR mask was printed new design for trapper . <br> | ||
* UV filter installed <br> | * UV filter installed <br> | ||
* Cathie needs a copy of MCK's, Journal of Applied Physics paper. <br> | |||
* Experimental Data for paper.What do we need in terms of flow rate, seeding densities, etc. <br> | |||
* Do 10 micron simulations. <br> | |||
<br> | <br> | ||
† CIMIT- Colson Grant<br> | † CIMIT- Colson Grant<br> |
Revision as of 14:24, 8 January 2009
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
8 January 2009 Lab Meeting Agenda
† Announcements
† COBRA
- problems: dead but green in the end
- RIE (CHF3), Rain?, and Cytop coated and thermal bonding with PTFE filter tested.
- new set made, in glove box: the 1st 3 on the DOE. SEM and SERS available.
- need to add humidity as it changes even in the glove box - this is no longer an issue, asked Ranjith and now can adjust humidity to constant
- difficulty in locating the bacteria
† Valve Array/Valve building (FJ)
* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture. ON HOLD
† F31: Cochlea
|