Klapperich Lab:Notebook/Lab Meeting Notes/2009/01/08: Difference between revisions
Cmklapperich (talk | contribs) No edit summary |
Cmklapperich (talk | contribs) No edit summary |
||
Line 16: | Line 16: | ||
<br> | <br> | ||
† Flu R01 <br> | † Flu R01 <br> | ||
* Check on sample amount<br> | * Check on sample amount.<br> | ||
* Plaque Assay. <br> | * Plaque Assay. <br> | ||
* Alex needs to be trained to make SU molds. Trained to make the monoliths (by Hussam By 1/15/09)--we're about to start the training--. <br> | * Alex needs to be trained to make SU molds. Trained to make the monoliths (by Hussam By 1/15/09)--we're about to start the training--. <br> | ||
<br> | <br> | ||
† SEPSIS Project <br> | † SEPSIS Project <br> | ||
* Sonali working on first draft of new version paper by | * Sonali working on first draft of new version paper by 1/19. <br> | ||
* Hussam working on Lambda phage data. <br> | * Hussam working on Lambda phage data. <br> | ||
<br> | <br> |
Revision as of 13:21, 8 January 2009
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
8 January 2009 Lab Meeting Agenda
† Announcements
† COBRA
- problems: dead but green in the end
- RIE (CHF3), Rain?, and Cytop coated and thermal bonding with PTFE filter tested.
- new set made, in glove box: the 1st 3 on the DOE. SEM and SERS available.
- need to add humidity as it changes even in the glove box - this is no longer an issue, asked Ranjith and now can adjust humidity to constant
- difficulty in locating the bacteria
† Valve Array/Valve building (FJ)
* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture. ON HOLD
† F31: Cochlea
|