Klapperich Lab:Notebook/Lab Meeting Notes/2009/02/26: Difference between revisions
Jane Zhang (talk | contribs) |
Jane Zhang (talk | contribs) |
||
Line 10: | Line 10: | ||
* Status: compressed air and vacuum. Happening NOW. | * Status: compressed air and vacuum. Happening NOW. | ||
Bioanalyzer <br> | Bioanalyzer - 2nd training March 3 9:30am <br> | ||
Pressure sensor <br> | Pressure sensor - quoted $325 SP70A or $1000+ SP70D, returning old one for them to look <br> | ||
† Announcements<br> | † Announcements<br> |
Revision as of 10:53, 26 February 2009
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
26 February 2009 Lab Meeting Agenda
Bioanalyzer - 2nd training March 3 9:30am † Announcements
- Direct measurement with engineered SERS substrate.
- Try glass fixture.
- Do Rhodamine.
-Need a size specific positive control. PS beads? charged?
† Silica Optimization (Lambda):
Specifically buy http://products.invitrogen.com:80/ivgn/en/US/adirect/invitrogen?cmd=catProductDetail&entryPoint=adirect&productID=N7565&messageType=catProductDetail |