Klapperich Lab:Notebook/Lab Meeting Notes/2009/02/26: Difference between revisions
Line 82: | Line 82: | ||
† Senior project <br> | † Senior project <br> | ||
* Megan<br> | * Megan<br> | ||
* Cutter plotter prototype to be soon bonded.<br> | * FEP Teflon film arrived. <br> | ||
* Cutter plotter prototype to be soon bonded. <br> | |||
* Now has access to 3" wafers from MCK. <br> | * Now has access to 3" wafers from MCK. <br> | ||
<br> | <br> |
Revision as of 11:13, 26 February 2009
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
26 February 2009 Lab Meeting Agenda
Bioanalyzer - 2nd training March 3 9:30am † Announcements
- Direct measurement with engineered SERS substrate.
- Try glass fixture.
- Do Rhodamine.
-Need a size specific positive control. PS beads? charged?
† Silica Optimization (Lambda):
Specifically buy http://products.invitrogen.com:80/ivgn/en/US/adirect/invitrogen?cmd=catProductDetail&entryPoint=adirect&productID=N7565&messageType=catProductDetail |