Klapperich Lab:Notebook/Lab Meeting Notes/2009/09/08: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
Cmklapperich (talk | contribs) |
Cmklapperich (talk | contribs) |
||
Line 29: | Line 29: | ||
* CMK: PCR 2 paper draft. <br> | * CMK: PCR 2 paper draft. <br> | ||
* CMK: PCR 1 draft. Analytical Chem. <br> | * CMK: PCR 1 draft. Analytical Chem. <br> | ||
* on-chip PCR on a series of diluted lambda phage DNA. LOD for ABI is 10<sup>-9</sup>g/ul | * on-chip PCR on a series of diluted lambda phage DNA. LOD for ABI is 10<sup>-9</sup>g/ul <br> | ||
* on-chip PCR have the same sensitivity.<br> | |||
* With new syring and tubing, on-chip PCR for the patient sample does not have detectable amplified product. however, the postitive control on the thermal cycle works good. <br> | * With new syring and tubing, on-chip PCR for the patient sample does not have detectable amplified product. however, the postitive control on the thermal cycle works good. <br> | ||
* New primers? <br> | * New primers? <br> | ||
Line 36: | Line 36: | ||
<br> | <br> | ||
† HDA (Lead: Jaephil)<br> | † HDA (Lead: Jaephil)<br> | ||
* Start planning R01 for Submission on 2/5/10. MM, JD, CMK. <br> | |||
* JD working on paper. Will deliver to MM this week. <br> | |||
* Figures discussion. <br> | |||
*<br> | *<br> | ||
Line 60: | Line 63: | ||
* Cathie submitted the companion BU IRB form for exemption. <br> | * Cathie submitted the companion BU IRB form for exemption. <br> | ||
<br> | <br> | ||
† | † RCA/HDA<br> | ||
<br> | <br> | ||
* PATH Grant <br> | * PATH Grant <br> |
Revision as of 11:09, 26 August 2009
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
8 September 2009 Lab Meeting
‡ Flu R01:Integration
‡ Coulter Flu Fraunhofer Project (Lead: Sonali, Team: Sonali, Jessie, Cathie, CMI Folks, Qingqing)
* set up 2 week check in meeting with team.
|