Shreffler:Notebook/Staff Meetings/2009/10/28: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
(Autocreate 2009/10/28 Entry for Shreffler:Notebook/Staff_Meetings) |
No edit summary |
||
Line 11: | Line 11: | ||
===Agenda Items=== | ===Agenda Items=== | ||
'''Projects/ Work Flow''' | |||
* CoFAR | |||
** total Syk protocol now in place -- problems? | |||
*** 4 done as of later today | |||
** supernatants being accumulated -- long term storage? | |||
*** can we send off site? | |||
*** possible space on the 14th floor? | |||
*** re-prioritize use of existing space | |||
** fixed cells for Treg -- Kenny working through; will need to plan for analysis | |||
*** all samples sent from other labs have been acquired | |||
* | * ICATA/ BioCSI/ URECA | ||
** emphasis on BioCSI analysis | |||
* MIA | |||
** Have not had confirmation from IRB of GCO reciept | |||
** Have printed new slides and will finish 'validation' this morning | |||
* Adjuvant | |||
** Neisha will redirect to Arah2 collaboration | |||
* Milk | |||
** Lara out any day -- are we ready? | |||
*** She's had the baby | |||
** set up CD25 depletion template | |||
** contamination issues? | |||
* Others | |||
** ITN -- status? involvement from Julie? | |||
---- | ---- | ||
=== | '''Recruitment/ Team Update''' | ||
* Performance reviews over next week | |||
---- | |||
'''Space/ Equipment''' | |||
* Cytometer | |||
** review procedure for HTS installation | |||
** discussion of centralized flow staff | |||
** pipette calibration | |||
* Desk/Bench Space | |||
** issues? | |||
---- | |||
'''Other''' | |||
* R course | |||
** tomorrow at 3:30 pm | |||
====Previous ToDo Items==== | |||
* create protocol for total Syk measurement (wayne) -- done | |||
* Re-organize data between the three Macs and add more back ups | |||
---- | ---- | ||
=== | ====New ToDo Items==== | ||
* Madhan and Wayne f/u with HS and AG re: CoFAR storage | |||
* analyze CoFAR with tSyk | |||
* Priya will reconcile missing CoFAR data | |||
* Alyssa will f/u with Lara re: BM1 | |||
Revision as of 07:44, 28 October 2009
ShreffLab Staff Meetings | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
Replace with user/time stampAgenda ItemsProjects/ Work Flow
Recruitment/ Team Update
Space/ Equipment
Other
Previous ToDo Items
New ToDo Items
|