Shreffler:Notebook/Staff Meetings/2009/10/28: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
(Autocreate 2009/10/28 Entry for Shreffler:Notebook/Staff_Meetings)
 
No edit summary
Line 11: Line 11:
===Agenda Items===
===Agenda Items===


*
'''Projects/ Work Flow'''


====Previous Action Items====
* CoFAR
** total Syk protocol now in place -- problems?
*** 4 done as of later today
** supernatants being accumulated -- long term storage?
*** can we send off site?
*** possible space on the 14th floor?
*** re-prioritize use of existing space
** fixed cells for Treg -- Kenny working through; will need to plan for analysis
*** all samples sent from other labs have been acquired


*  
* ICATA/ BioCSI/ URECA
** emphasis on BioCSI analysis


* MIA
** Have not had confirmation from IRB of GCO reciept
** Have printed new slides and will finish 'validation' this morning
* Adjuvant
** Neisha will redirect to Arah2 collaboration
* Milk
** Lara out any day -- are we ready?
*** She's had the baby
** set up CD25 depletion template
** contamination issues?
* Others
** ITN -- status? involvement from Julie?
----
----


===Other Discussion===
'''Recruitment/ Team Update'''
* Performance reviews over next week
----
 
'''Space/ Equipment'''
* Cytometer
** review procedure for HTS installation
** discussion of centralized flow staff
** pipette calibration
 
* Desk/Bench Space
** issues?
 
----
'''Other'''
 
 
* R course
** tomorrow at 3:30 pm
 
====Previous ToDo Items====
 
* create protocol for total Syk measurement (wayne) -- done
* Re-organize data between the three Macs and add more back ups


*




----
----


===Things To Do===
====New ToDo Items====


#
* Madhan and Wayne f/u with HS and AG re: CoFAR storage
* analyze CoFAR with tSyk
* Priya will reconcile missing CoFAR data
* Alyssa will f/u with Lara re: BM1









Revision as of 07:44, 28 October 2009

ShreffLab Staff Meetings <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page
<html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html>

Replace with user/time stamp

Agenda Items

Projects/ Work Flow

  • CoFAR
    • total Syk protocol now in place -- problems?
      • 4 done as of later today
    • supernatants being accumulated -- long term storage?
      • can we send off site?
      • possible space on the 14th floor?
      • re-prioritize use of existing space
    • fixed cells for Treg -- Kenny working through; will need to plan for analysis
      • all samples sent from other labs have been acquired
  • ICATA/ BioCSI/ URECA
    • emphasis on BioCSI analysis
  • MIA
    • Have not had confirmation from IRB of GCO reciept
    • Have printed new slides and will finish 'validation' this morning
  • Adjuvant
    • Neisha will redirect to Arah2 collaboration
  • Milk
    • Lara out any day -- are we ready?
      • She's had the baby
    • set up CD25 depletion template
    • contamination issues?


  • Others
    • ITN -- status? involvement from Julie?

Recruitment/ Team Update

  • Performance reviews over next week

Space/ Equipment

  • Cytometer
    • review procedure for HTS installation
    • discussion of centralized flow staff
    • pipette calibration
  • Desk/Bench Space
    • issues?

Other


  • R course
    • tomorrow at 3:30 pm

Previous ToDo Items

  • create protocol for total Syk measurement (wayne) -- done
  • Re-organize data between the three Macs and add more back ups



New ToDo Items

  • Madhan and Wayne f/u with HS and AG re: CoFAR storage
  • analyze CoFAR with tSyk
  • Priya will reconcile missing CoFAR data
  • Alyssa will f/u with Lara re: BM1