Smolke:Move: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
No edit summary
Line 10: Line 10:
*We're moving to Menlo Park on 12/19 ([[User:Arwbrown|Arwen]])
*We're moving to Menlo Park on 12/19 ([[User:Arwbrown|Arwen]])
*I'm out of town 12/22-1/5 ([[User:James V. Vowles|Jay]])
*I'm out of town 12/22-1/5 ([[User:James V. Vowles|Jay]])
*Trying to move in between 12/25-12/31 or 1/7-1/11.  Regardless of when I move in, I plan on being in LA that first week of January --[[User:Andrewb|A-Train]] 18:31, 3 December 2008 (EST)


==Equipment responsibilities/status==
==Equipment responsibilities/status==

Revision as of 16:31, 3 December 2008

Home        Contact        Internal        Protocols        Lab Members        Publications        Research       


Move timeline:

  • Moving company packing January 5-6
  • Truck loading Caltech January 7
  • Truck unloading Stanford January 8 (lab members be at Stanford to help unpacking and set up)

Lab packing date(s)

  • I'm out of town 12/19-12/28 (Josh)
  • We're moving to Menlo Park on 12/19 (Arwen)
  • I'm out of town 12/22-1/5 (Jay)
  • Trying to move in between 12/25-12/31 or 1/7-1/11. Regardless of when I move in, I plan on being in LA that first week of January --A-Train 18:31, 3 December 2008 (EST)

Equipment responsibilities/status

clean / decontaminate

  • microcentrifuges (MC1 - ; MC2 - ; MC3 - ; MC4 - ; MC5 - ; MC6 - ; MC7 - )
  • pcr machines (E1 - ; E2 - ; D3 - )
  • vacufuge
  • large centrifuge
  • ultracentrifuge
  • radiation area / equipment
  • tecan safire
  • CE-LIF
  • spectrophotometer
  • qRT-PCR instrument
  • FX imager
  • gel imager
  • nanodrop
  • gel boxes, power supplies, combs, etc
  • LC-MS
  • Quanta
  • stir / hot plates
  • ph meters
  • scales
  • water baths
  • dry heat blocks
  • chemostat water batch
  • shakers (S30 - ; S37 - )
  • open shaker
  • incubators (I30 - ; I37 - )
  • CO2 incubators (I1 - ; I2 - ; I3 - ; I4 - )
  • light microscope
  • fluorescent microscope

Notes

  • To minimize a last minute overload on dirty glassware, start going through your solutions and getting rid of stuff that you know you or someone else will not use before the move so that the glassware can be washed throughout the month.
  • Only take solutions that are important / difficult to remake (stock solutions, RNase free, etc); all others throw away before move.
  • Make sure all of your stuff in the fridge and freezers are in sealed, labeled boxes; no loose items as stuff will be turned on end.
  • Make sure you get rid of all stuff that you do not need in the fridges and freezers; consolidate your stuff as we will not be able to plug in all of our freezers in the truck.
  • Go through your drawers and throw away stuff you don't need, or put into general stock if will be shipped, or pack in own personal box; the lab should be completely cleaned out when we leave.