Smolke:Washroom Schedule: Difference between revisions
(→DAILY) |
(→WEEKLY) |
||
Line 18: | Line 18: | ||
==WEEKLY== | ==WEEKLY== | ||
Gel Station – M–Change bench paper. | Gel Station – M–Change bench paper. | ||
Dishwasher – M–Top up rinse dispenser, clean screen. | Dishwasher – M–Top up rinse dispenser, clean screen. | ||
Autoclave – M-–Check screen. Check pressures. | Autoclave – M-–Check screen. Check pressures. | ||
Scales – T– Wipe down and maintain cleanliness, check supplies. | Scales – T– Wipe down and maintain cleanliness, check supplies. | ||
Media – T– Make LB and LB Agar as needed for Endy lab. | Media – T– Make LB and LB Agar as needed for Endy lab. | ||
Disposables – W– Check general supplies. | Disposables – W– Check general supplies. | ||
Freezers – W– Remove frost on one freezer per week. | Freezers – W– Remove frost on one freezer per week. | ||
Glassware – Th– Maintain stock of autoclaved bottles. | Glassware – Th– Maintain stock of autoclaved bottles. | ||
Recycling – Th–Empty paper recycling bins to hall bins. Recycle batteries. | Recycling – Th–Empty paper recycling bins to hall bins. Recycle batteries. | ||
Sinks – F–Wipe down and maintain cleanliness. | Sinks – F–Wipe down and maintain cleanliness. | ||
ChemTracker – One area per week to maintain. | ChemTracker – One area per week to maintain. | ||
A– B17 4C, -20C, Cold Room | A– B17 4C, -20C, Cold Room | ||
B– Chemical Room | B– Chemical Room | ||
C– Bay A itemsTC room, TC 4C, -20 Smolke, -20 Endy, Endy 4C | C– Bay A itemsTC room, TC 4C, -20 Smolke, -20 Endy, Endy 4C | ||
D– Small Refrigerators in other bays/ Hood/Flammable/Corrosive | D– Small Refrigerators in other bays/ Hood/Flammable/Corrosive | ||
Revision as of 15:13, 1 April 2010
DAILY
Autoclave - Start up procedure, flush & dart warm-up.
Autoclave – Tubes, glass cylinders, flasks to 1000ml.
Run Dishwasher – Run flasks and tubes as priority. Max two full cycles in one day.
Tips – Reload and Autoclave tips and tubes for Smolke and Endy labs. Recycle packaging.
Receive Shipments – Check and file paperwork, inventory it for Smolke lab, put away items.
Recycling – Break down boxes, stage neatly for pick-up. Returnable styrofoam boxes to loading dock
Orders – Place orders as necessary.
Waste – M,W,F Autoclave any biohazard waste from plate bin or tissue culture room.
WEEKLY
Gel Station – M–Change bench paper.
Dishwasher – M–Top up rinse dispenser, clean screen.
Autoclave – M-–Check screen. Check pressures.
Scales – T– Wipe down and maintain cleanliness, check supplies.
Media – T– Make LB and LB Agar as needed for Endy lab.
Disposables – W– Check general supplies.
Freezers – W– Remove frost on one freezer per week.
Glassware – Th– Maintain stock of autoclaved bottles.
Recycling – Th–Empty paper recycling bins to hall bins. Recycle batteries.
Sinks – F–Wipe down and maintain cleanliness.
ChemTracker – One area per week to maintain.
A– B17 4C, -20C, Cold Room
B– Chemical Room
C– Bay A itemsTC room, TC 4C, -20 Smolke, -20 Endy, Endy 4C
D– Small Refrigerators in other bays/ Hood/Flammable/Corrosive
MONTHLY
Training – Make sure everyone has current training for Safety and Chemicals. Equipment – Schedule maintenance for pipets once a year Smolke-May. Endy-July Hoods – Check dates on waste containers, schedule pick-up. Meetings – Meet with Christina and Drew. Meetings for BERT when necessary.