*Doubling Time: ''Want'':1hr            ''Get'':55.45min
*Doubling Time: ''Want'':1hr            ''Get'':55.45min
*There are only YFPs in this run.


===Chemostat Settings===
===Chemostat Settings===

Revision as of 12:16, 27 April 2006

03/24/06

Purpose: To establish an approximate life expectancy for E.Coli in the sortostat under chemostatic operation.

Experimental Conditions

  • Doubling Time: Want:1hr Get:55.45min
  • There are only YFPs in this run.

Chemostat Settings

  • There are no sorts in this run.
  • Flow Rate: 11.09nL/hr
    • Actual: 12.12nL/hr
  • Dilution Rate: 0.69/hr
    • Actual: 0.75/hr
  • "Clean Chemostat Max Period": 1.44928hr
    • "Actual": 1.32hr

"Dilution Rate": 1/hr

  • Minimum Pumping Time: 70s
    • "Actual": 105s; this gives us 2 screens/4.95min
  • Dead Time per Screen: 20s
  • Dead Time per Sort: 47s
  • Pump Cycle Period: 400ms
  • Sorting Perdiod: 4.95
  • Feeder Fill: 10s
  • Wash: 10s
  • Clean: 15s
  • Pressurize: 5s
  • Fluid Pressure: 5.82 psi
  • Push-UP: 14.50 psi
  • Push-DOWN: 20.44 psi

Note that the pump worked abnormally well under these pressure conditions.

Results

cells look to stabilize at 400 and then drop to about 350


03/17/06

Purpose: To establish an approximate life expectancy for E.Coli in the sortostat under chemostatic operation.

Experimental Conditions

  • Doubling Time: Want:1hr Get:55.45min

Chemostat Settings

  • There are no sorts in this run.
  • Flow Rate: 11.09nL/hr
    • Actual: 12.12nL/hr
  • Dilution Rate: 0.69/hr
    • Actual: 0.75/hr
  • "Clean Chemostat Max Period": 1.44928hr
    • "Actual": 1.32hr

"Dilution Rate": 1/hr

  • Minimum Pumping Time: 30s
  • Dead Time per Screen: 20s
  • Dead Time per Sort: 47s
  • Pump Cycle Period: 400ms
  • Sorting Perdiod: 4.95
  • Feeder Fill: 10s
  • Wash: 10s
  • Clean: 15s
  • Pressurize: 5s
  • Fluid Pressure: 5.30 psi
  • Push-UP: 14.07 psi
  • Push-DOWN: 20.44 psi

Results

Control lines emptied and entire run failed.

03/16/06

Purpose: To establish an approximate life expectancy for E.Coli in the sortostat under chemostatic operation.

Experimental Conditions

  • Doubling Time: Want:1hr Get:55.45min

Chemostat Settings

  • There are no sorts in this run.
  • Flow Rate: 11.09nL/hr
    • Actual: 12.12nL/hr
  • Dilution Rate: 0.69/hr
    • Actual: 0.75/hr
  • "Clean Chemostat Max Period": 1.44928hr
    • "Actual": 1.32hr

"Dilution Rate": 1/hr

  • Minimum Pumping Time: 30s
  • Dead Time per Screen: 20s
  • Dead Time per Sort: 47s
  • Pump Cycle Period: 400ms
  • Sorting Perdiod: 4.95
  • Feeder Fill: 10s
  • Wash: 10s
  • Clean: 15s
  • Pressurize: 5s
  • Fluid Pressure: 5.07 psi
  • Push-UP: 14.07 psi
  • Push-DOWN: 20.02 psi

Results

Run Failed. Cell counts were impossibly large. Images show that there were no cells present soon after run started. This is probably due to cell growth that was so slow it could not keep up with the dilution rate. A lack of oxygen could be playing a role here.

03/12/06

Purpose: To establish an approximate life expectancy for E.Coli in the sortostat under chemostatic operation.

Experimental Conditions

Chemostat Settings

  • There are no sorts in this run.
  • Dilution Rate: .69/hr
  • Clean Chemostat Period: 1.45hr
  • Minimum Pumping Time: 30s
  • Dead Time per Screen: 20s
  • Dead Time per Sort: 47s
  • Pump Cycle Period: 400ms
  • Actual Cleaning Period: 1.32hr
  • Sorting Perdiod: 4.95
  • Feeder Fill: 10s
  • Wash: 10s
  • Clean: 15s
  • Pressurize: 5s
  • Fluid Pressure: 4.47 psi
  • Push-UP: 13.91 psi
  • Push-DOWN: 19.7 psi

Results

Catastrophic Failure! Airline blew off actuator and all tank pressure was lost.

Cells look to stabilize at ~100, then the pressure fails and cells diverge from steady state


01/24/06

Purpose: To establish an approximate life expectancy for E.Coli in the sortostat under chemostatic operation.

Experimental Conditions

Chemostat Settings

  • There are no sorts in this run.
  • Dilution Rate: Varies, (see graph)
  • Clean Chemostat Period: 1/D.R.
  • Minimum Pumping Time: Changed from 60s to 50s when the dilution rate changed from 0.4/hr to 0.5/hr
  • Dead Time per Screen: 10s
  • Dead Time per Sort: 75s
  • Pump Cycle Period: 400ms
  • Actual Cleaning Period: ?
  • Sorting Perdiod: ?
  • Feeder Fill: 10s
  • Wash: 10s
  • Clean: 15s
  • Pressurize: 5s
  • Fluid Pressure: 5.19 psi
  • Push-UP: 15.47 psi
  • Push-DOWN: 19.39 psi

Results

Equipment failure

Previous Work

10/09/05

Cell death in long term experiment due to possible O2 depletion