User:Heather N. Currey/Notebook/Taylor C. elegans Lab Notebook/2013/06/04

From OpenWetWare

(Difference between revisions)
Jump to: navigation, search
(3 June 2013)
(3 June 2013)
Line 8: Line 8:
==3 June 2013==
==3 June 2013==
*Run GFP/L4440 batch control analysis
*Run GFP/L4440 batch control analysis
-
*Ins 2 Egglay start: stop: n=
+
*Ins 2 Egglay on NGM (poured 20/5) start: 11:15 stop: 16:15,  n=7
-
* transfer cross
+
*Inoculated OP50 to seed with Adam for stock and experimental plates

Revision as of 19:45, 4 June 2013

Project name Main project page
Previous entry      Next entry

3 June 2013

  • Run GFP/L4440 batch control analysis
  • Ins 2 Egglay on NGM (poured 20/5) start: 11:15 stop: 16:15, n=7
  • Inoculated OP50 to seed with Adam for stock and experimental plates



Personal tools