User:Linh N Le/Notebook/2009/06/29: Difference between revisions

From OpenWetWare
< User:Linh N Le‎ | Notebook‎ | 2009‎ | 06
Jump to navigationJump to search
Line 14: Line 14:
*Andy has apparently already setup the power modulator and the beam expander
*Andy has apparently already setup the power modulator and the beam expander
*He says the only thing left is to move the microscope into the new lab and setup the steering optics
*He says the only thing left is to move the microscope into the new lab and setup the steering optics
**The microscope is now in the new lab
***It is too tall for the table, so Andy is going to get mike or joe to come and raise the shelf up a touch


==Kinesin==
==Kinesin==

Revision as of 11:52, 29 June 2009

Project name <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page
<html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html>

To Do

  • Help with ot?
  • Kinesin assays?
  • continue to update the chemicals list
  • w/e Koch and the grads will need

Laser

  • Andy has apparently already setup the power modulator and the beam expander
  • He says the only thing left is to move the microscope into the new lab and setup the steering optics
    • The microscope is now in the new lab
      • It is too tall for the table, so Andy is going to get mike or joe to come and raise the shelf up a touch

Kinesin

  • Brigette wants to try to new kinesin assay (phosphorous kits)