User:Linh N Le/Notebook/2009/08/20: Difference between revisions
From OpenWetWare
(→Cables) |
(→Cables) |
||
Line 19: | Line 19: | ||
*The wires are all now fixed and ready to go. I even screwed the cables back into the DAQ card | *The wires are all now fixed and ready to go. I even screwed the cables back into the DAQ card | ||
**I will return these cables to the Optics Lab and place them on the black table near the tweezers so that a qualified professional can re-install them | **I will return these cables to the Optics Lab and place them on the black table near the tweezers so that a qualified professional can re-install them | ||
[[User:Steven J. Koch|Steve Koch]] 02:42, 21 August 2009 (EDT): Thanks! And thanks for looking up the video -- my opinion is strongly in favor of not doing extra soldering -- I think it can only cause harm and there is no added benefit. | |||
<!-- ##### DO NOT edit below this line unless you know what you are doing. ##### --> | <!-- ##### DO NOT edit below this line unless you know what you are doing. ##### --> | ||
|} | |} |
Revision as of 23:42, 20 August 2009
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
To Do
Cables
Steve Koch 02:42, 21 August 2009 (EDT): Thanks! And thanks for looking up the video -- my opinion is strongly in favor of not doing extra soldering -- I think it can only cause harm and there is no added benefit. |