User:Lorrie LeJeune/Construction of the Koch Institute for Integrative Cancer Research at MIT: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
(New page: <gallery> Image:Koch-MIT_CementMixer.png|Boston Sand and Gravel's finest Image:Koch-MIT_DiggingBegins.png|Excavating for the curtain wall, April 3, 2008 Image:Koch-MIT_Construction041008.p...)
 
No edit summary
Line 8: Line 8:
Image:Koch-MIT_Drilling.png|Pile driving
Image:Koch-MIT_Drilling.png|Pile driving
Image:Koch-MIT_pipes-.png|Drainage pipes
Image:Koch-MIT_pipes-.png|Drainage pipes
Image:Koch-MIT_StillLife.png|Pile driving, April 30, 2008
Image:Koch-MIT_StillLife.png|Still life with pipes and barrels
Image:Koch-MIT_Drilling.png|Still life with pipes and barrels
Image:Koch-MIT_Drilling.png|Pile driving, April 30, 2008
Image:Koch-MIT_TheGuys.png|The Guys
Image:Koch-MIT_TheGuys.png|The Guys


</gallery>
</gallery>

Revision as of 18:54, 30 April 2008