User:Madeleine Y. Bee/Notebook/CHEM-581 Experimental Chemistry/2014/09/03: Difference between revisions
From OpenWetWare
No edit summary |
No edit summary |
||
Line 24: | Line 24: | ||
*Construct calibration curve for each of the two absorbance maximums | *Construct calibration curve for each of the two absorbance maximums | ||
====Equilibrium | ====Equilibrium Measurements==== | ||
*Dilute all solutions to 10 mL of 1.5 ppm & transfer to glass test tube (3 mL needed for absorbance measurements) | |||
**2.0 ppm to 1.5 ppm | |||
**7.5 mL 2.0 ppm in 10 mL H2O | |||
**8.0ppm to 1.5 ppm | |||
**1.88 mL 8.0 ppm in 10 mL H2O | |||
**80.0 ppm to 1.5 ppm | |||
**187.5 uL 80.0 ppm in 10 mL H2O | |||
**200.0 ppm to 1.5 ppm | |||
**75 uL 200.0 ppm in 10 mL H2O | |||
*Determine the amount of Malachite green absorbed into a film | |||
*Determine the equilibrium of free Malachite green vs bound malachite green with I.C.E. table | |||
*Determine the mass of malachite green absorbed per mass of film | |||
====FTIR Measurements==== | ====FTIR Measurements==== |
Revision as of 18:29, 2 September 2014
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
September 3, 2014ProceduresCompleting Film SynthesisContinued from Wednesday, 8/29/2014<br.> Procedure detailed by Dr Hartings
Beginning New Film SynthesisProcedure detailed by Dr Hartings
UV-vis Measurements
Equilibrium Measurements
FTIR MeasurementsPowder X-ray Diffraction MeasurementsDifferential Scanning Calorimetry Measurments |