User:Pranav Rathi/Notebook/OT/2010/04/29: Difference between revisions

From OpenWetWare
< User:Pranav Rathi‎ | Notebook‎ | OT‎ | 2010‎ | 04
Jump to navigationJump to search
(Autocreate 2010/04/29 Entry for User:Pranav_Rathi/Notebook/OT)
 
No edit summary
(2 intermediate revisions by the same user not shown)
Line 6: Line 6:
| colspan="2"|
| colspan="2"|
<!-- ##### DO NOT edit above this line unless you know what you are doing. ##### -->
<!-- ##### DO NOT edit above this line unless you know what you are doing. ##### -->
==Entry title==
==Optical tweezer==
* OptoBio
*I am glad to say this; that our tweezer is almost ready to use. Thanks to Andy (for his tremendous job in designing the set-ups and his very valuable advice) and Anthony (tremendously help me with the set-up and TCA set-up with power-supply is  POA; piece of art.  
 
*He-Ne made our alignment so easy that now even a Cave-Man can do it, he can just focus on the He-Ne reflection  in the microscope and that is it: IR is sitting right on the top of it.
 
*A part of steering assembly and collimation is left which we will fix tomorrow.
<!-- ##### DO NOT edit below this line unless you know what you are doing. ##### -->
* We will also try to complete TCA setup.
|}
*Next week Anthony is not here, so I am planning to do beam profiling again at lower temperature, sum signal experiment and power calibration and may be some unzipping ;->
 
[[Category:Optical tweezers Notes Archive]]
__NOTOC__

Revision as of 13:23, 15 November 2012

Project name <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page
<html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html>

Optical tweezer

  • I am glad to say this; that our tweezer is almost ready to use. Thanks to Andy (for his tremendous job in designing the set-ups and his very valuable advice) and Anthony (tremendously help me with the set-up and TCA set-up with power-supply is POA; piece of art.
  • He-Ne made our alignment so easy that now even a Cave-Man can do it, he can just focus on the He-Ne reflection in the microscope and that is it: IR is sitting right on the top of it.
  • A part of steering assembly and collimation is left which we will fix tomorrow.
  • We will also try to complete TCA setup.
  • Next week Anthony is not here, so I am planning to do beam profiling again at lower temperature, sum signal experiment and power calibration and may be some unzipping ;->