User:Pranav Rathi/Notebook/OT/2010/04/29

From OpenWetWare
< User:Pranav Rathi‎ | Notebook‎ | OT‎ | 2010‎ | 04
Revision as of 13:23, 15 November 2012 by Pranav Rathi (talk | contribs)
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Project name <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page
<html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html>

Optical tweezer

  • I am glad to say this; that our tweezer is almost ready to use. Thanks to Andy (for his tremendous job in designing the set-ups and his very valuable advice) and Anthony (tremendously help me with the set-up and TCA set-up with power-supply is POA; piece of art.
  • He-Ne made our alignment so easy that now even a Cave-Man can do it, he can just focus on the He-Ne reflection in the microscope and that is it: IR is sitting right on the top of it.
  • A part of steering assembly and collimation is left which we will fix tomorrow.
  • We will also try to complete TCA setup.
  • Next week Anthony is not here, so I am planning to do beam profiling again at lower temperature, sum signal experiment and power calibration and may be some unzipping ;->